1 / 79

PRE-SAD SAFETY MEETING

PRE-SAD SAFETY MEETING. Pre-SAD Safety Meeting. Monday, June 15, 2009 CEBAF Center Auditorium 2:00 to 3:00 p.m. Welcome. Meeting History This is the tenth pre-shutdown safety briefing Engineering has been hosting these meetings but participation has been broad (see agenda)

kayo
Download Presentation

PRE-SAD SAFETY MEETING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRE-SAD SAFETY MEETING

  2. Pre-SAD Safety Meeting Monday, June 15, 2009 CEBAF Center Auditorium 2:00 to 3:00 p.m.

  3. Welcome • Meeting History • This is the tenth pre-shutdown safety briefing • Engineering has been hosting these meetings but participation has been broad (see agenda) • We’ve had one meeting per year except for 2003 and 2006 when the workload called for two • We added a post-shutdown lessons learned meeting last year • Physics is hosting this year’s post-shutdown lessons learned meeting

  4. Agenda

  5. Introduction • Jefferson Lab is developing/has developed a good reputation for safety performance over the past few years. • An important component of this is the confidence that we develop that • Our coworkers will look out for each other • Our work locations are largely free from overt hazards

  6. Introduction, cont’d. • The important result then is that we share a workplace that is routinely free from serious accidents and injuries • It’s taken us a number of years to get to this enviable spot: • Perhaps the major risk we face is complacency • We got here by vigilance – • By awareness of our surroundings and work hazards • By engineering out hazards, and • By pausing to reevaluate when we are unsure • Let’s stay alert and keep up the good work!

  7. Work Planning and Documentation Harry Fanning

  8. Review How we do business here at JLab: • Plan our work • Analyze the hazards associated with that work • Develop and then implement controls for those hazards • Work within the plan • Provide feedback after the work is complete • Gives invaluable information to you for the next time you perform the work as well as to your coworkers who might perform similar work elsewhere at the lab • Helps provide information for continuous improvement ISMS

  9. Review (continued) • Work Planning, Control and Authorization Flow Diagram. • Was implemented last year in accordance with ISMS prior to the lab’s HSS Review. • Can be found on your JLAB “Insight” Page • It is designed with your safety in mind.

  10. Documentation What we use to document this process: • ES&H Manual (Section 3000 – Planning for Safe Operations) • Work Control Documents (WCDs) • Task Lists: Facilities Management Work Request, ATLis, (and clones), verbal instructions, etc. • The ATLis Hazard Analysis is from ES&H Manual Section 3000 • Log Books: Accelerator E-Log (and clones), Pansophy, paper logs, etc. • Scheduling tools: Microsoft Project, S.A.D. tools, Shift Plans, Whiteboard, etc. • Lessons Learned

  11. Using Task Lists • JLab Work Control Policy: • Utilize area specific TaskList as directed by affected work group, or when an activity: • Involves cross – divisional work • Involves many sub-tasks and/or many people • Affects other staff’s safety or work space environment • Affects the operational status of workplace system (power, water, interlocks, etc.)

  12. Using Task Lists (continued) What do I need to do if I have a job to perform? • Utilize the appropriate Task List. • Example: If you are going to be working in: • Accelerator = ATLis • Where can I find the appropriate Task List system? • All the Task Lists are in one place: http://www.jlab.org/listsites/

  13. How much is Enough? How much information do I need to put in a Task List? • Enough information to satisfy the Work Coordinator • Accelerator = Steve Suhring • Generally: • Think about who will be affected by your work. Your description should tell them how they will be affected. • A brief description of the work is enough. • Since there is a section for the affected groups to post questions – the Task List writer will eventually adjust the level of detail to address the feedback. • Your Task Hazard Analysis should address all concerns and feedback as well.

  14. How much is Enough? (continued) When to use a“blanket” entry in a Task List • If the task is repetitive. • If the affected work groups don’t change from task to task and only one ‘notification’ for affected groups is needed. • If all the hazards are addressed in the THA or the hazards do not change each time the task is performed. If ANY of the above conditions change: Make an individual Task List entry!

  15. ESH&Q Manual Changes • FYI: Overall, the ES&H Manual is undergoing a substantial revision process • On the documentation side, Chapters 3210, 3310 and 3330 are currently being changed to reflect the streamlined process of the Work Planning, Control and Authorization. • NO CHANGES WILL OCCUR DURING THIS SAD! • THERE WILL BE TRAINING BEFORE ANY CHANGES ARE IMPLEMENTED!

  16. Questions? Harry Fanning (ex.7619)

  17. Pre-SAD Safety Data Briefing Stephen Smith ESH&Q/QACI

  18. Comparison of Notable Events and First Aid Cases • Significant increase in reporting year over year. Site feedback is that this is due to reporting emphasis. • Increased reporting helps to address problems before escalation. Examples are the new USI process & training, as well as the site wide survey for non-skid application.

  19. June 1 ‘08 – Present Medical Events

  20. Significant Notable Events and Categories • Configuration Control is the largest category, whether the issue is updated prints, understanding machine configuration prior to entry, or understanding how test equipment has been modified. • Some high profile examples are: • PHY-08-0618-NEW– Lifting Incident/ Hall B Issue: Detector damaged; work planning and print updates not adequate • Date: 06/11/08 • COO-08-0903-NEW– Unauthorized Access to a Controlled AreaIssue: Software did not match personnel training, allowing unauthorized entry Date: 09/03/08 • ENG-08-0908-NEW – Unexpected Discovery of Hazardous Energy While Conducting DiagnosticsIssue: Test equipment modified with no optest, resulting in unsafe condition • Date: 09/08/08

  21. Significant Notable Events and Categories • Configuration Control, continued: • ENG-08-0924-NEW – CHL valve & pipe separationIssue: As-built configuration did not match the engineering printDate: 09/24/08 • ACC-08-1006-NEW – NL11 Waveguide Jumper EventIssue: Work Controls did not allow for proper configuration after maintenance • Date: 10/06/08 • FML-09-0401-NEW – Previously Unknown Electrical Line BreachIssue: Live electrical line was not known of, nor found, during a utility survey • Date: 03/30/09

  22. Significant Notable Events and Categories Personnel Injuries were also a significant category. Some examples are below. PHY-08-0910-NEW – Finger Injury During Block Movement – DOE ReportableIssue: Crane operator was helping with rigging, and too close to the load Date: 09/10/08 FEL-08-1008-NEW – Residual Charge in HV CableIssue: Unplugged cable retained a charge; worker brushed his thumb against lead Date: 10/08/08 FML-09-0202-NEW – Ladder Fall - CEBAF Center Computer CenterIssue: Using a ladder on a sloped surface Date: 02/02/09 ENG-09-0213 NEW – Medical condition, unknown to new Supervisor, results in Issue after Transfer of Employee Issue: Communication of individual medical conditions to supervisors Date: 02/13/09

  23. Safety Observations Unsafe Acts Since 1 June 2008 All Safes: Jan 1 - Jun 11 ‘09 = 277 Oct 1 – Dec 31 ‘08 = 431 • Decrease in Procedures, with corresponding increase in PPE and Tools/Eqpt. • Matches time frame of HSS Assessment prep & recovery • This effect was much more dramatic in Q209 (Jan 1 – Mar 31) • Conclusion is that the site has shifted back to more “field oriented” work

  24. CATS Primary Cause Codes Jun 1 – Dec 31 ‘08 Jan 1 ‘09 - present • Procedures (Orange) and Personnel (Blue) Issues remain the drivers • Procedures main category is “Not adequate” • Personnel main category is “Inattention to Detail” • Entries decreased by about 60% over the same period • Matches time frame of HSS Assessment prep & recovery

  25. New Trending Capability – Safety Warden Findings • Categories devised and implemented Feb 15 • Previously a subjective system that could not easily be trended

  26. Summary • Ensure work planning includes configuration controls aspects of the job • Equipment lineup before and after • Any print changes that will need to occur after the work is complete • When planning work, review the Lessons Learned database for similar hazards • http://coe.jlab.org • Accessible from the Insight front page

  27. Compressed Gas Initiative NED WALKER

  28. Compressed Gas Initiative • We have a number of compressed gas bottles storage sites around the lab • Maintenance at the storage location includes • Cleaning debris out of the racks to avoid corrosion • Ensuing that retaining chains are functional • Covers are present on gas bottle caps and have socks • During the SAD please review (or ask Safety Warden to review) your compressed gas bottles storage locations for • Caps with socks on unused bottles, clean, secure staging/storage • Presence of legacy bottles - not current vendor (GTS/Praxair) or absence of pedigree • Status Tags {Full, In Use or Empty} please verify correct

  29. Compressed Gas Initiative, cont’d. • Remember: when handling, treat all bottles as FULL, all the time! • Vendors warrantee compressed gas quality for a limited time • We have bottles on-site that exceed the warrantee period for some gasses • Do you really know the pedigree of the gas you’re using for your application? • We have bottles that belong to past vendors • These bottles should be returned to the original vendor • These bottles may be past their hydro date • The contents may be of limited use due their age • If you need support or if you have questions regarding compressed gas bottles at your storage location(s)contact Ned Walker, GTS/Praxair SOTR

  30. Questions, Support? Ned Walker (ex.6638) Pager 584-6638 nwalker@jlab.org

  31. SUMMER “SAD” Radiological ConcernsHighlights David Hamlette RADCON Field OPS Coordinator

  32. TAKE A BOW!!! Since the 2008 Safety SAD meeting, the Laboratory has made marked improvements with respect to Radiological controls: • Communication between work groups and RadCon • Pre-planning(ATLis, and all the Lists….) • Keeping co-workers accountable • Asking questions when met with unusual circumstances

  33. Refresher quiz!!! • Who knows the RadCon cell #? 876-1743 2. T/F Only the GARWP requires annual signing? False; there are several SRWP w/ similar requirements 3. Radiological conditions frequently change; what are the current entry postings of the FEL during rest. access? RCA/RMA 4. For unescorted access into the accelerator enclosures, what is required? RW-I, Dosimeter, ODH, and area specific training

  34. “UPGRADES” • ATLis (and all the lists) – to include more descriptive radiological planning (thanks Theo Larrieu) • Signage modifications – “Flip-signs” for temporary radiological/radioactive materials areas. • Tracking potentially–contaminated rack status. • Relocated RAM staging in a few areas (i.e. Hall C)

  35. Things to remember…. Release of Materials • All items coming out of accelerator enclosures require RadCon survey PRIOR to removal • RCT’s perform site rounds at least twice daily to support work efforts • RadCon is responsible for surveying and bringing up items from N&S Linacs, BSY.

  36. Things to remember…. Hardware removal Working in Radiation Areas Removal of beamline components require RadCon notification Working in radiation areas can require more than just notification!

  37. Workingin Hall A&CEquipment Racks Moving “Radioactive Materials” Disassembly of “RAM” Coordinate work with RadCon!!

  38. Disposing of Metals “Moratorium- Madness” • Accelerator Enclosure Metals Cleared by RadCon (IndistinguishableFrom Background) Can Be throw in the regular trash • They should have a “Do Not Recycle” sticker affixed to them • No recycling of metals that have been in any accelerator enclosure • SOSA area is setup to store “Moratorium” metals “In hopes of….”

  39. RAD WORKER “GOOD PRACTICE” • Review GRWP, SRWP, and RCOP’s from time to time… • Be familiar (YOU!!) with CURRENT radiological work conditions. • ATLis/Clist/Alist… are all great planning tools, but a phone call allows better coordination and support! • When in doubt call the RadCon cell phone 876-1743

  40. CEBAF Summer SAD Briefing JACK LUDWIG

  41. Major Tasks • Archiver Upgrade – 17-27 June • Temporary Archiver available • Temporary data to be discarded after upgrade • Injector • Replace LL2 Gun • Girder replacement for 2nd Wien Filter • Big Jobs involving • Alignment • Diagnostics • Magnets • Vacuum

  42. Major Tasks – Facilities • CHL Addition Construction • Crane inspections and PM • Sump pump repairs • Transformer inspection and repair • Cooling tower maintenance • Hurricane power test – 9 July

  43. CHL Building Addition

  44. Transformer PM July 8-10

  45. Major Tasks – Tunnel • Alignment work • Cryomodule leak checks, repairs, cryo-cycles, testing • Stone drop – SE corner • Cryomodule installation (C50-9 at 1L04)? • Repairs, modifications, and PMs on various systems • PSS certification

  46. Cryomodule C50-9 to 1L04 Installation?

  47. PSS Certification August 3-7

  48. http://opsntsrv.acc.jlab.org/ops/Operability_Files/SAD_calendar/SAD_calendar.htmhttp://opsntsrv.acc.jlab.org/ops/Operability_Files/SAD_calendar/SAD_calendar.htm

  49. http://opsntsrv.acc.jlab.org/ops/Operability_Files/SAD_calendar/SAD_calendar.htmhttp://opsntsrv.acc.jlab.org/ops/Operability_Files/SAD_calendar/SAD_calendar.htm

  50. Lessons We Have Learned • Walk the job with your work crew before starting. • Initial conditions may require reworking the plan • Beware of Scope Creep – stop and reassess • Report suspected or known damages to equipment • Housekeeping? Clean up daily • Use ATLis.

More Related