Entergy Louisiana, LLC (North) Proposed Transmission Reliability Projects

Entergy Louisiana, LLC (North) Proposed Transmission Reliability Projects. Entergy Transmission Planning Summit New Orleans, LA July 31, 2007. ELL-North Transmission Reliability Projects. Sterlington-Bastrop: Build 115 kV Line (2009 ISD). Northwest LA / South AR voltage support (Sarepta)

kbittner
Download Presentation

Entergy Louisiana, LLC (North) Proposed Transmission Reliability Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Entergy Louisiana, LLC (North)Proposed TransmissionReliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007

  2. ELL-North Transmission Reliability Projects Sterlington-Bastrop: Build 115 kV Line (2009 ISD) Northwest LA / South AR voltage support (Sarepta) (2010 ISD) Red Gum Area 115kV voltage improvement plan (2010 ISD) Grambling–Winnfield Reenergize 230 kV Line (2011 ISD)

  3. Sterlington to Bastrop:Build New 115kV Line Scenario: • The 115kV transmission system in northeast Louisiana is primary served by generation located at Sterlington. This load area encompasses eight substations with a total peak load of approximately 200 MW. • The loss of the Sterlington to Bastrop 115kV line, which results in a separation of load from the generation source, will result in low voltage levels from Bastrop to Oak Grove to Darnell. A potential overload is projected on Oak Grove to Galion in 2007. The remaining source to the area is Baxter Wilson generation, which is approximately 100 miles from the farthest isolated load. Recommended Solution: • Tap the Crossett North – Sterlington 115 kV line by constructing about 7 miles of double circuit 115 kV line into North Bastrop. • Install 3 breakers at North Bastrop substation with room for 4th breaker; each breaker to be connected to lines from Sterlington, North Crossett, and Oak Grove/Log Cabin/Bastrop. • Proposed In-Service Date: 2009 Estimated Cost: $15 MM

  4. Sterlington to Bastrop: Build New 115kV Line Tap 115 kV N. Crossett-Sterlington line

  5. LOG CABIN GALLION NORTH BASTROP BASTROP IPCO STERLINGTON Sterlington to Bastrop: Build New 115kV Line

  6. Sterlington to Bastrop: Build New 115kV Line LOG CABIN GALLION NORTH BASTROP BASTROP IPCO STERLINGTON

  7. NW Louisiana/South Arkansas Voltage Support Plan Scenario: • The following single contingencies cause low voltage in the extreme southwestern corner of the EAI service territory: • Loss of the Magnolia East - McNeil line segment • Loss of the Magnolia Steel - Magnolia East line segment • Loss of the Magnolia Steel - Kerlin S.S. line segment • In addition, low voltage concerns propagate into north Louisiana (Lucky substation), for a loss of any of the following lines: • 115 kV line from Carroll to Ringgold • 115 kV line from Truss to Vienna • 115 kV line from Vienna to MT. Olive • 115 kV line from SpringHill to Taylor • 115 kV line from Haynesville to Emerson • 115 kV line from Danville to Jonesboro • Capacitor bank additions do not provide sufficient improvement to this region. • The transmission grid performance can be improved by delivering a high voltage source into the Sarepta area. Sarepta resides close to the El Dorado-Longwood (AEP-West) 345 kV line. Recommended Solution: • Build a new 345/115 kV tie at Sarepta 115 kV substation and install a 21.6 MVAR capacitor bank at Emerson. • Upgrade of 115kV line from Minden to Minden Bulk • Install a 36 MVAR cap bank at Lucky (Conditional on Grambling-Winnfield Reenergize 230 kV Line completion) • Install a 28.8 MVAR cap bank at Vienna • Proposed In-Service Date: 2010 Estimated Cost: $24 MM

  8. Emerson: 21.6 MVAr Capacitor Bank Sarepta: Build 345/115kV substation; Tap El Dorado-Longwood line Minden-Minden Bulk: Upgrade 115kV Line Vienna: Cap Bank Installation Lucky: Cap Bank Installation

  9. Red Gum Area 115kV Voltage Improvement Plan Scenario: • The Red Gum area is served by substations that average 20 mile distances between them. With the lack of limited generation sources in the area combined with the distance between stations, and Natchez generator not being in service low voltage levels are expected. • For the loss of Alto-Swartz or Swartz-Winnsboro line, low voltages are expected at substations south of Winnsboro substation and west of the Mississippi River in addition to overload on line Standard-Red Gum. Recommended Solution: • Re-energize Black River – Midway at 115 kV. • Increase capacitor bank at Winnsboro to 36 MVAR. • Increase capacitor bank at Wisner to 32.6 MVAR • Install one 115 kV circuit breaker at Black River with protection for two line terminals (one looking toward Standard and Beaver Creek, the other looking toward Red Gum and Plantation). • Relay modifications will be needed at Red Gum, Plantation, Black River, Beaver Creek (Cleco station) and Standard. • Communication equipment for a redundant blocking scheme for the 3 terminal line would be needed. • Proposed In-Service Date: 2010 Estimated Cost: $3.2 MM

  10. Red Gum Area 115kV Voltage Improvement Plan

  11. Grambling–Winnfield Reenergize 230 kV Line(Danville-Hodge Alternative) Scenario: • Contingency: The loss of the Danville to Hodge 115kV line causes low voltages from Hodge to Sailes. Recommended Solution: • Re-energize idle Danville – Winnfield 115 kV Line. • Convert the existing Danville – Winnfield 115 kV line to 230 kV operation. • Construct 230/115 kV substation east of Hodge; move auto from Danville (eliminate Danville as a step-down station) • Install a 230kV breaker bay at Winnfield and the new substation • Proposed In-Service Date: 2011 Estimated Cost: $12.5 MM

  12. Energize 230kV line

  13. Grambling Sailes Lucky Chatham Hodge 34.5 kV Line Jonesboro 115 kV Line 230 kV Line Substation with breakers Danville Substation with no breakers Dodson Winn Prison Standard Winnfield

  14. Grambling Sailes Lucky Chatham Hodge New Sub 34.5 kV Line Jonesboro 115 kV Line 230 kV Line Substation with breakers Danville Substation with no breakers Dodson Winn Prison Standard Winnfield

  15. Target Areas Beyond 2011 West Ouachita load growth: Build 115/230kV line Build 230kV line from the New Sub to Rilla Lake Providence load growth: Build 115 kV line Complete 230 kV loop around W. Monroe Area