Overview of activities of the first six months and of the next six months Angelo Frascella
In synthesis • Data Structure Scenarios and use case/services at good point • 7 technical deliverable has to be delivered within M12 • One is almost ready (D1.1 – M6) • An incoming one (D2.1 – M7) collecting results from T2.1 and T2.2 seems in at good point for T2.1, still not available for T2.2 part • Next deliverables: • D3.1 – M8 (AUEB), D1.2 – M9 (DITF), D1.3 – M9 (AUEB), D3.2 – M10 (ATC), D2.2 – M12 (ATC)
Some general results required in the first months • First needed results inside the project (from KoM decisions) • WP1: • Scenarios definition - DITF =>done • Services and tools definitions – AUEB => done • Identification of machine and processes - DOMINA=> running • Assessment of scenarios with Piacenza – ENEA => done • Definition of parameter that have been optimized – ENEA => running • Collecting and analysis of consumption data – ENEA =>running • Validation of Scenarios by IIG – EURATEX => ongoing • WP2: • Needed data and meters - AUEB-RC => to do? • Available data and meters – DOMINA => to do
Some general results required in the first months • WP 3: • Set of real data about production scheduling and routing collected in the space of two weeks – DOMINA and DITF => To do • WP 5: • Definition of questions that need an answer in order to allow to define the architecture requirements – INTRA => done? • Decision about UML tool to use – INTRA => done • First analysis about data format for interfacing ERP and MES (from TEXWIN) and supply chain partners (MODA-ML) (ENEA and DOMINA) => to do • WP 8 • Wiki structure and content about ARTISAN Architecture => done (and, up to now, not used)
Deliverable dashboard on the web site Please, watch the dashboard: http://www.artisan-project.eu/artisan/imple/pgcl.asp?lingua=en&p=462&node_id=7.4 Or, by menu, RESERVED AREA -> DELIVERABLE LIST
A remainder • Don’t forget to send me filled templates about: • Activities reporting for the first six months • Periodic Progress report for the first six months • Timesheet for the first six months