Project overview

Project overview “ Multi-fuel energy generation for Sustainable and Efficient use of Coal (SECoal) ” Speaker: Sylwester Kalisz. 1. KIC InnoEnergy | CC Poland+ project review | Krakow, 11-12 April 2011. SECoal project - goal and impacts. Objective :

Download Presentation

Project overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project overview “Multi-fuel energy generation for Sustainable and Efficient use of Coal (SECoal)” Speaker: Sylwester Kalisz 1 KIC InnoEnergy | CC Poland+ project review | Krakow, 11-12 April 2011

  2. SECoal project - goal and impacts Objective: SECoal project is dedicated to deliver innovative approaches to the co-utilization of multi-fuel inputs of various origin and quality in conjunction with coal-based power generation. It aims at quick delivery of industrially demanded, yet innovative, technological solutions and products ready for direct deployment in power utilities • For existing business processes: • SECoal will enhance security of energy supply through diversification of fuels; contribute to reduction of greenhouse gas emissions through enhanced usage of bio-derived fuels • SECoal will deliver incremental innovation technologies directly applicable in related industries • SECoal will contribute to reduction of operating costs of power generation utilities • For new business processes: • SECoal will deliver innovative co-firing technologies thanks to services provided by dedicated, newly established spin-off company 2

  3. SECoal project summary 3

  4. WP1 Components for advanced co-utilization concepts WP2 Efficient and economic utilization of lean gases from in situ processing of coals WP3 Modeling tools, monitoring and control of multi-fuel power generation WP4 Advanced concepts of integrated multi-fuel, low-emission power generation WP5 Social impacts, public perception and educational programmes SECoal projectWP organisation WP0 MANAGEMENT AND MARKET ANALYSES 4

  5. SECoal projectWPs 5

  6. SECoal projectWPs 6

  7. SECoal projectWPs 7

  8. SECoal projectWPs 8

  9. SECoal projectWPs 9

  10. SECoal projectWPs 10

  11. SECoal projectplan 11

  12. SECoal projectproducts: Reverse flow non-catalytic combustion of coal mine Ventilation Air Methane Effects were calculated per average coal mine shaft in Poland: (flowrate: 720 000 Nm3/h) Ecological effect (Methane combusted): Demonstration plant in ICE-PAS for 0.2%vol.CH4 8581 tCH4/ year for 0.5%vol.CH4 21452 tCH4/ year Methane has Global Warming Potential at least 25 times higher than CO2!!! Heat recovery effect for 1.0 %vol.CH4 ~37 MWt for 0.4 %vol.CH4 ~4.3 MWt With the SECoal Project Ms Anna Pawlaczyk’s PhD thesis will be connected 12

  13. SECoal projectproducts: CFB simulator CFB simulator will be a powerful software that will help to design, operate and optimize performance of large and medium scale circulating fluidized bed boilers Picture – not existing yet Market value – CFB simulator will be able to help with design and with operational problems thus cutting costs by some percent. Industrial CFB boilers owners already expressed their will to use such a product. At least 1 PhD thesis and 2-3 MSc or BSc thesis Introduction: late 2013 13

  14. SECoal projectproducts: Catalyst for methane oxidation (lean sources - VAM) • Working temperature: 250 – 350 °C • Main challenges: • finding the formula of an efficient and economically reasonable catalytic system; • determination of minimal content of CH4 allowing its autothermic combustion; • evaluation of the versatile method of methane enrichment; • Educational achievements: • Ph.D. Thesis 3 • M.Sci. 10 • B.Sci. 11 • Market value - analysis in progress • Possible date of commercialization (idea + laboratory/semi-pilot scale): 2013-2015 14

  15. right wall front wall left wall rear wall OFA OFA poz. 34 500 1 OFA OFA 1 1 poz. 31 800 poz. 30 900 2 1 poz. 30 900 2 3 2 poz. 29 700 poz. 30 900 2 poz. 26 800 poz. 26 800 poz. 26 800 poz. 26 800 3 3 4 3 poz. 21 800 poz. 23 000 poz. 21 800 4 4 4 poz. 19 500 5 poz. 19 500 5 5 poz. 19 500 poz. 19 500 5 Boiler operator’s control station SECoal projectproducts: Monitoring system for corrosion hazard in pulverized coal boilers Visualization of the measurements of oxygen concentration and „on-line” layout of corrosion hazard of pulverizedboiler obtained with the use of neural networks Market All power stations equipped with PC boilers 80 units x 200 000 zł in Poland. 15

  16. SECoal projectproducts: Burners for liquid biofuel Burner for bio-liquid fuel output : 1.5 t/hr applicable for start up and co-firing biofuel in PC boiler Multistream Burner for bio-liquid fuel output: 300-700 kg/hr applicable for co-firing biofuel in PC boiler ( additional effect- reduction NOX emission by reburning mechanism in high temperature) • Market: PC and stoker boilers installed in PP and CHP 40 PC units x 1 000 000 PLN 16

  17. SECoal projectproducts: Micronisation of agro-biomass New installation for biomass fuel producers to apply in PP and CHP plant using co-firing of biomass Cost of industrial installation at output 3 t/hr- 5 mln PLN - market is under analysis 17

  18. SECoal projectproducts: Expert services in co-firing technologies (LCA, fuel database and on-line monitoring) • Risk based inspection methodology and system for on-line monitoring of combustion system • Special equipment and system will be developed for monitoring the damage of critical locations of high temperature components in the combustion system (software and hardware) • Reduction of maintenance cost • Reduction of production loss due to not planned shutdowns • MSc and PhD theses involved: 1 MSc • Estimate of time to market: 3 years • Software for optimising co-firing systems and database for biomass fuels • Development of a Biomass Database • Development of optimizing methods/software for co-firing of agro-biomass and bio-waste with coal • Increase of efficiency of co-firing system • Reduction of costs of maintenance • Increased production • Estimate of MSc and PhD theses involved: 1 PhD • Estimate of time to market: 2 years • LCA (Life Cycle Assessment) analyses of multi-fuel co-utilization technologies • Development of LCA models for different technologies • Optimisation method of multi-fuel technologies from environmental poitn of view • Decrease the load on environment, i.e. CO2 emission • Estimate of MSc and PhD theses involved: 1 PhD • Estimate of time to market: 2 years 18

  19. SECoal projectproducts: spin-off in co-firing technology services • Fields of activity: • technologies for emission reduction from power generation and industrial processes • technologies increasing the renewable energyshare in overall energy supply • services in energy management with special focus on the use of waste energy sources. • The offer will consist of: technical advice, consulting services,R & D work, sales of licenses and upgrades of existing installations. • Status • Market analysisinitiated: supply and demandidentified; • Business model in verification; • Commercializationstrategyconditioned by newRegulation in exploitation of IP rightsat the SilesianUniversity of Technology; • Spin-off business plan in progress 19

  20. SECoal projectbudget 20

  21. SECoal projectbudget distribution 21

  22. SECoal project: Summary 22

  23. SECoal project: Recent developments and Open issues • Migration of GIG from SECoal to ACoPP • Partnership cancellation: IST and KTH – Energy Dept. • PA prepared and circulated within partners for signing • Most of partners report they are just about to sign • IP most difficult • Formal industrial partner – EDF (co-manager: H.Kubiczek) • Budget availability (?) 23