1 / 14

“Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

12GeV Upgrade - Beam Transport. “Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts. June 1, 2009. Outline. Introduction Beam Transport S/R Layouts Status/Summary. Introduction.

Download Presentation

“Option B” Spreader/Recombiner Design Review Beam Transport S/R Layouts

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 12GeV Upgrade - Beam Transport “Option B”Spreader/Recombiner Design ReviewBeam Transport S/R Layouts June 1, 2009

  2. Outline • Introduction • Beam Transport S/R Layouts • Status/Summary

  3. Introduction • The 12GeV upgrade requires extensive modifications to the spreader and recombiner regions of the machine • These are the most congested regions in the beam transport system • Goal to reuse as much of the existing hardware as possible • Complicated by incomplete documentation of girders/bracketry • The 12GeV 2008 layouts never progressed beyond the rough 2D songsheet level

  4. Introduction – cont’d Option B Layouts: • Established symmetry between spreader/recombiner • Reduces layout design effort • Fewer unique dipole bracket designs • Step height ratios are consistent between S/R • Allows consistent quad layout between S/R • Include new septa layout(Tief layout) in the east spreader • Rotates several existing girders to “fix” element sequence (BPM-Quad-Correctors) – Ops request • Quads positioned based on step height ratios • Requires no change to matching section quad girder layouts • Significant effort has been made to gather and model as-built S/R information

  5. Beam Transport S/R Layouts • Two spreader regions • East and west spreaders • Three recombiner regions • East, west and transport recombiners

  6. Beam Transport S/R Layouts – East Spreader Current Configuration June 2008 12GeV Configuration

  7. Beam Transport S/R Layouts – West Spreader Current Configuration June 2008 12GeV Configuration

  8. Beam Transport S/R Layouts – East Spreader June 2008 12GeV Configuration 12GeV Option B Configuration Highlights… • Replaced 2m dipole in Hall D line with three 1m dipole magnets • Rotated 3S03 girder to put BPM upbeam of quad • Added BPM in 7 line, IPM7S03A per I&C’s CR 08-040 • Incorporated the Tiefenback septa layout • Quadrupoles match requirements set by Alex • Layout requires only three girders be rebuilt and minor mods to three others

  9. Beam Transport S/R Layouts – East Recombiner June 2008 12GeV Configuration 12GeV Option B Configuration Highlights… • Rotated 1, 3, 5, & 7 line girders in the “step” to put BPM upbeam of the quad (exceptions: 3R08 & 7R08) • Added BPM in line 7, IPM7R07A per I&C’s CR 08-040 • Quadrupoles match requirements set by Alex • Layout requires only two girders to be rebuilt and minor mods to two others

  10. Beam Transport S/R Layouts – West Spreader June 2008 12GeV Configuration 12GeV Option B Configuration Highlights… • Added BPMs in lines 6 &8, IPM6S03A & IPM8S03A per I&C’s CR 08-040 • Quadrupoles match requirements set by Alex • Layout requires only one girder to be rebuilt and minor mods to five others

  11. Beam Transport S/R Layouts – West Recombiner June 2008 12GeV Configuration 12GeV Option B Configuration Highlights… • Added BPMs in lines 6 & 8, IPM6R07A & IPM8R07A per I&C’s CR 08-040 • Quadrupoles match requirements set by Alex • Layout requires minor mods to five girders

  12. Beam Transport S/R Layouts – Transport Recombiner June 2008 12GeV Configuration 12GeV Option B Configuration Highlights… • Added vertical correctors at 6T09, 8T07, & 8T09 to meet 12GeV BdL specs • New correctors required small shifts in the 6 & 8 line quads relative to the data transmitted to Alex… preparing request to CASA to evaluate alternate AT quad layout for use in all west S/Rs • Quadrupoles match requirements set by Alex • Layout requires minor mods to eight girders in the “step”

  13. Status/Summary • Still expect small changes to the S/R layouts • Design efforts are focused on items not likely to be impacted by layout changes • Will hold-off on the design of the vertical support stands until layout has “totally frozen after feedback from this review” • Dipole & girder support arm locations laid in to the 95% level… still refining a few areas • Bracket designs ~80% complete • We have nearly completed the new and modified quad girder designs and associated detail drawings • New and modified dipole vacuum chambers designs are ~50% complete • Looks like ~50% of the total will be recycled from existing machine • Will begin detailed septa vacuum chamber design this month