An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMPARISION OF PJM AND INDIAN GRID

  2. PJMINDIAN GRID

  3. (1927)WORLDS FIRST POWER POOL RTO INSTALLED 1,65,378 MW PEAK 1,35,000 MW 474 BILLION UNITS ANNUAL GENERATION 350 MEMBER COMPANIES 51 MILLION PEOPLE SERVED AREA SERVED 4,20,505 SQ KM STATES 13 + DC 19% OF US GDP 500 EMPLOYEES, AVG AGE 42 YRS LINE LENGTH 79,952 KMS RTO STATUS SINCE 2002 2 TIER GOVERNANCE (BOARD + COMMITTEE) TSO INSTALLED 1,23,000 MW PEAK 90,000 MW 587.3 BILLION UNITS ANNUAL OWNERSHIP OF GENERATION ASSETS STATE 57%, CENTRAL 32%, PRIVATE 11% ~700 MILLION PEOPLE SERVED AREA SERVED 32,87,590 STATES 25 + 7 UT EMPLOYEES IN RLDC ABOUT 450 1,78,400 CKM >=220KV 2,23,377 MVA TRANSFORMATION >=220 36 CONTROL AREAS PJM INDIAN GRID

More Related