1 / 23

Assessment of the Sustainable Offshore Wind Potential in Portugal

Assessment of the Sustainable Offshore Wind Potential in Portugal. Paulo Costa , Teresa Simões , Ana Estanqueiro. OWEMES, CIVITAVECCHIA (ROME) 20-22 April 200 6. Departamento de Energias Renováveis Unidade de Energia Eólica e dos Oceanos. paulo.costa@ineti.pt teresa.simoes@ineti.pt

keilah
Download Presentation

Assessment of the Sustainable Offshore Wind Potential in Portugal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Assessment of the Sustainable Offshore Wind Potential in Portugal Paulo Costa , Teresa Simões , Ana Estanqueiro OWEMES, CIVITAVECCHIA (ROME) 20-22 April 2006 Departamento de Energias Renováveis Unidade de Energia Eólica e dos Oceanos paulo.costa@ineti.pt teresa.simoes@ineti.pt ana.estanqueiro@ineti.pt INSTITUTO NACIONAL DE ENGENHARIA, TECNOLOGIA E INOVAÇÃO

  2. 1- Main objective and rule slide 2 of 22

  3. Main objective and rule • Objective: • To identify coastal regions in Portugal with sustainability indicators for wind potential offshore development • Main Rule • Help developers to plan offshore wind parks along coastal areas taking into account the economic and technical feasibility of the project subjected to the following factors: • Distance to coast less than 15km; • Sea depth less than 40m; • A gently slope between bathymetry 20 and 40m; • Good resource assessment available; • Close to the available electric grid connections. slide 3 of 22

  4. 2- Offshore assessment and methodology slide 4 of 22

  5. Offshore assessment and methodology • A reasonable wind potential assessment was made by making a high resolution (3X3km) long term simulation with the popular MM5 atmospheric mesoscale model; • A set of a full one year of Reanalysis data (at intervals of 6h) from NCAR’s Mass Storage Systems ingested to MM5; • Simulate the power output field (h/year) for two turbine models: GEWE 1500SL (rotor with 60m height) and VESTAS V80 (80m height); slide 5 of 22

  6. Offshore assessment and methodology • Inter annual variability applied to simulated wind and power fields computed with help of 4 anemometric long term stations located in mainland Portugal; • Digitized bathymetric lines up to 40m depth; • Use spatial operations available in GIS (Geographic Information Systems) software to obtain favorable areas. slide 6 of 22

  7. 3- Set of numerical simulations slide 7 of 22

  8. Set of numerical simulations • Four one-way nested domains with resolutions of 81km 27km 9km and 3km • High resolution MM5 domain (3X3km) used for offshore assessment slide 8 of 22

  9. Set of numerical simulations • Parameterization schemes previously selected by making a couple of control simulations in order to minimize the differences between observed and simulated wind speed and direction values: • Gayno-Seaman (PBL); • RRTM (radiation); • GRELL (cumulus); • SIMPLE ICE (microphysics); • NOAH (soil model); • Selected numerical schemes slide 9 of 22

  10. Set of numerical simulations • INETI’s long term wind stations used in this work for validation purposes and to compute intra annual variability slide 10 of 22

  11. 4- Some numerical results slide 11 of 22

  12. Some numerical results • Simulated number of hours at full capacity for two turbine models • MM5 • (3X3km) • Intra annual variability • accounted GEWE 1.50 SL 1500 kW H=60m VESTAS V80 2000 kW H=80m slide 12 of 22

  13. Some numerical results • Power curves used in MM5 • simulations • for each turbine • model • Resolution • (3X3km) slide 13 of 22

  14. 5- GIS operations slide 14 of 22

  15. GIS operations • Some spatial GIS operations was used to make a “simple” query taking into account the following factors: • Distance to coast below 15km; • Sea bathymetry lower than 40m; • A gently slope between 20 and 40m depths; • “acceptable” wind resource (number of hours at full capacity great than 2300h/year); • Proximity to the network with available grid connection capacity. slide 15 of 22

  16. 6- GIS results slide 16 of 22

  17. GIS results • Six favourable areas were identified • for each • turbine • model. Areas A,B,C to F (capital letters) GEWE 1.50 SL 1500 kW H=60m VESTAS V80 2000 kW H=80m slide 17 of 22

  18. GIS results • A “zoom” for each selected area Figueira da Foz Espinho/Porto Berlengas/Peniche Portimão/Albufeira Bordeira Estuário do Tejo/Caparica/Tróia Vila Real de Sto António slide 18 of 22

  19. GIS results • Query results obtained for each selected area slide 19 of 22

  20. 7- Concluding remarks slide 20 of 22

  21. Concluding remarks • Unlike previous common public opinions, the preliminary results of this work enhance some interesting areas for developing offshore wind parks in Portugal • Some estuarine regions (e.g. Tagus estuary) reveal good acceptance values • Therefore, a more sophisticated study must be realized in order to deal with the presence of navigation channels, bridges and other hydro-dynamical estuarine phenomena. slide 21 of 22

  22. Concluding remarks • Results here presented aimed INETI to start a special monitoring campaign in the Peniche to Lisbon region in order to validate the results near west coast of Portugal – best resource assessment available Berlengas/Peniche • A set of high resolution numerical simulations are being prepared by INETI involving microscale and mesoscale models to produce a rigorous and highly accurate assessment for offshore wind power in Portugal FINAL

  23. Thank you!

More Related