DOORS input for OSLC Storyboard. V0.1 Gray Bachelor. Aims and objective. To show how real ALM tools support and represent PLM process and related information
E N D
DOORS input for OSLC Storyboard V0.1 Gray Bachelor OLSC PLM Workgroup
Aims and objective • To show how real ALM tools support and represent PLM process and related information • To show how DOORS 9.3 represents the OSLC PLM Reference Model through the selected scenario of a Systems Engineer responds to change in Requirements OLSC PLM Workgroup
Purpose of this document • To summarise the flow of changes to the requirements that DOORS needs to represent OLSC PLM Workgroup
Summary of the key business entities & their relationships Pre-condition (Before Is based upon or applies to* CR * Assuming basic triaging has been done prior to the start of the scenario At some context version V’ System or product context Controlled config Req Implem Post-condition (After Is implemented by At some new context version V’’ CR System or product context System or product context Controlled config Controlled config Req Implem Req Implem Updated to achieve the CR Updated to achieve the CR OLSC PLM Workgroup
Overall view of the scenario and naming Story 1 Story 2 1st set of changes to requirements Steps 0.0 to 0.4 2nd set of changes to requirements Steps 2.0 to 2.X Implement the 1st set of changes Steps 1.0 to 1.X Implement the 2nd set of changes Steps 3.0 to 3.X In the kitchen ready OLSC PLM Workgroup
Summary of the Scenario flow from a tools perspective – Story 1 0.0 to 0.4 We aim to show the tool status at end phase in the flow 0.0 0.2a 0.2b 0.3 0.4 OLSC PLM Workgroup
Story 1 Requirements changes to be shown as DOORS baselines through the scenario OLSC PLM Workgroup
Story 2 New and changed requirements to be shown as DOORS baselines through the scenario OLSC PLM Workgroup
Story 2 New and changed requirements to be shown as DOORS baselines through the scenario OLSC PLM Workgroup
Links • Mike’s page • http://open-services.net/bin/view/Main/PlmScenariosGm • Files used at 14/4 • HSUVExample_Story_1.pptx: Story 1 (Requirements Change) Step by Step Description with Pictures (updated to match revisions of above) • # HSUVExample_Story_2.pptx (WORK IN PROCESS) Slides describing the Story 2 sequence, which adds two variants of the emissions requirement OLSC PLM Workgroup