1 / 15

Cosylab 2011 Status Report: MA Team Overview at End of CWO-3

Detailed status report for Cosylab MA team at the end of CWO-3, covering MAPS, iLLRF, NI performance tests, team collaborations, and key tasks completed and in progress.

keirab
Download Presentation

Cosylab 2011 Status Report: MA Team Overview at End of CWO-3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. the best people make cosylab MACS week 2/2011status report(@ nearly end of CWO-3) Joze Dedic (joze.dedic@cosylab.com) … on behalf of CSL MA team

  2. In this presentation overview MAPS iLLRF NI performance tests Cosylab 2011

  3. Overview • acceptance peak load by the end of CWO-3 • ¼+ tickets already ACP • remaining ~¾ • ~½ close collaboration of both teams • ~½ “granted” (preceding stages of tickets falling into previous category & mngmnt) Cosylab 2011

  4. Status reports Cosylab 2011

  5. CSL_team.count() = 19 • 19 people are seriously involved (not all full time) in at least one of the MA sub-projects • projects: PCC, REDNET, FECOS, iLLRF, IS, MAPS • “technologies”: LabVIEW, VHDL, DSP, C#, MA-CM • training such a pool of MA-educated resources: • requires careful planning for next CWO • CSL has ~36 developer/engineering FTEs • causes occasional hiccups • IS hiccup • Tilen is recovering from surgery • Rok stepped in for IS • Tillen is supposed to be back (for two weeks) the next week • we are doing all we can to help meet MA milestones Cosylab 2011

  6. MSE MAPS Cosylab 2011

  7. Work done Work in progress quite some bug/support TRAC tickets resolved finalized IPv6 support code SIM and MAPS installer MAPIDD document (just updated after the review) LabVIEW SIM TCP/IP read improved and reconnect implemented Connection handling (alive checks) and SIM message 32-bit alignment just implemented (C# part only) MAPS user manual

  8. Work to be done • MAPS test plan done, but needs a final touch work • connection handling (alive checks) and SIM message 32-bit alignment to be implemented in LabView • small amount of available effort (~days) still available • should be defined what to be done ASAP to avoid “last minute panic” • acceptance of the remaining tickets foreseen for mid-July • no big effort foreseen for MA team here

  9. KVO iLLRF Cosylab 2011

  10. Completed tasks Study LLRF requirements and architecture Not very extensive Thomson LLRF documentation – hard to study and understand, lot of time spent Considering RT LabView but dropped, luckily doesn’t change much regarding requirements and A&D Finalized Architecture & Design document Race condition issue took some time, but solved LLRF trigger PCB design for MRF universal IO adapter – signal convert only 5 adapters received from production, finalized Pulse generation logic inside MTR’s FPGA ITC – trigger FECOS component completed ITC XML document prepared, reviewed by RMO Cosylab 2007

  11. Completed tasks – contd. ILC Configuration of LLRF through TINE based on XML & PVSS Error handling ILC XML document is growing as part of ILC implementation Received D-LLRF TINE simulator, installed and it starts up At first no simulator was foreseen Used in-house TINE simulator with single field to test connection D-LLRF simulator came late but still on time Valuable for development and initial testing TINE->LabView TINE.dll implemented Not working on RT LabView => decided to go with WinXP LabView Simple tests carried out No support for arrays – can be done in CWO-4 No support for asynchronous callbacks – investigation needed Cosylab 2007

  12. Yet to be done in CWO-3 ILC – should be completed on time (2011-07-22) Verify that D-LLRF simulator is working as expected Measurements Maybe measurements not available with simulator Custom commands Finalize ILC XML Define test cases – should be completed on time (2011-07-22) Testing with D-LLRF simulator Around 5 people involved Spent ~60% of estimated effort On time with due dates PM… Cosylab 2007

  13. LSE NI performance tests Cosylab 2011

  14. Work to be done; measurement scenarios • files (sequences) • 1, 300 • parallelism • concurrent, sequential • from -> to variations / how • HDD -> PXI controller RAM • PXI controller RAM -> FlexRIO RAM • using DMA or not • file sizes variations: • worst case (file size 1 MB kB) • typical case (file size 40kB / 100kB) • controllers • PXI-8110, PXI-8102, PXI-8108 Cosylab 2011

  15. Other presentations for CSL work… REDNET, PCC & FED, IS, Rok FECOS, Miha C#, Roland Cosylab 2011

More Related