1 / 52

Model for Improvement

PLAN. DO. ACT. STUDY. Model for Improvement. What are we trying to accomplish?. AIM. What can we change that will result in an improvement?. How will we know that a change is an improvement ?. CHANGE. MEASUREMENT. PDSA –testing a change. MARU. From YouTube.

keitha
Download Presentation

Model for Improvement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PLAN DO ACT STUDY Model for Improvement What are we trying to accomplish? AIM What can we change that will result in an improvement? How will we know that a change is an improvement? CHANGE MEASUREMENT

  2. PDSA –testing a change MARU From YouTube What is Maru trying to achieve? How many ideas does he try? Is he successful? What was the possible negative outcome?

  3. Rapid Cycle Change PLAN PLAN PLAN PLAN DO DO DO DO ACT ACT ACT ACT STUDY STUDY STUDY STUDY What are we trying to accomplish? What can we change that will result in an improvement? How will we know that a change is an improvement?

  4. PROBLEM : AIM of this change:

  5. Do a PDSA to solve a problem at home AIM of this change:

  6. PROBLEM : unpacking the dishwasher is inefficient AIM: unpack the dishwasher in a more efficient way • Tom to rearrange cupboard today • -Mary and Tom to unpack into one cupboard for 4 days How easy it is to unpack the dishwasher Put half the cups and half the glasses in the cupboard just above the dishwasher Mary – it will look horrible and I will hate it Tom – it will be easy and Mary will like it

  7. PLAN DO ACT STUDY Model for Improvement What are we trying to accomplish? AIM What can we change that will result in an improvement? How will we know that a change is an improvement? CHANGE MEASUREMENT

  8. Measurement Outcome measure Are we getting closer to our target?

  9. Measurement Process measure (Bundle compliance) Did we use the whole bundle in every patient every time?

  10. Measurement Measuring the impact of a change Was the change an improvement?

  11. Measuring over time • a volunteer to write • a volunteer to measure • graph paper

  12. Annotated Run Chart Community Need Change Made in June I

  13. Interpreting Data: what is the story? Before (Feb) After (Aug) I

  14. What is the real story? Feb Aug Feb Aug Change Made Change Made Feb Aug Change Made in June Feb Aug Feb Aug Change Made Change Made I

  15. Prevention of Mother to Child Transmission. A sub-district in a province in SA Positive PCRs at 6 weeks (target <5%) Feb 2010 8.2% Feb 2011 3.2% Improvement?

  16. Positive PCRs at 6 weeks (target <5%) Feb 2010 8.2% Feb 2011 3.2% Improvement?

  17. Run Chart: Rules for Identifying Statistically Significant Change Median Median Shift: 6 points in row on same side of the median Note: A point exactly on the centerline does not cancel or count towards a shift Rule 2 Rule 1 Trend:5points in row headed in same direction Note: Ties between two consecutive points don’t cancel or add to a trend Rule 3 Rule 4 Data line crosses once Too few runs: total 2 runs Median Median 11.4 Astronomical Point: a obviously, even blatantly different value Note: Every set of data will have a highest and lowest data point. This does not mean the high or low are astronomical Runs: too few or too many runs I Provost and Murray

  18. Run Charts One of the most powerful tools for improvement Describe a process over time Shows trends the process is experiencing Can be used to analyse whether the change was an improvement Data can be used to drive change

  19. Outcome measurement Are we getting to our target? Was the change an improvement? How do we measure HAIs?

  20. Measuring infection rates Lessons from an ICU

  21. Quality Improvement 101 Problem?

  22. Measuring Infection Rates • Total number of infective cases per 1,000 device days: Total No. of VAP cases X 1,000 Numerator Ventilator days Denominator

  23. Definition of VAP “Pneumonia is considered as ventilator associated if the patient was intubated and ventilated at the time orwithin 48hrs before the onset of the infection” “VAP is suspected when a patient on mechanical ventilation develops: a new or progressive pulmonary infiltratewith fever /leucocytosis and purulent tracheobronchial secretions”

  24. Overcoming Numerator Issues Numerator Total No. of VAP cases Patients with X 1,000 Ventilator days Denominator

  25. Overcoming Numerator Issues – diagnosing the HAI (workbook) Checklists for Diagnosing the HA Infection used by the team

  26. Overcoming Denominator Issues At the same time every day the Unit manager counts devices in use in the ward

  27. Measuring HAI Percentages and rates % (or rate) = Numerator/ denominator eg Rate of infection = readmissions for septic caesarian section wounds per week / number of Caesarian Sections performed per week Rate of infection = Number of VAP / 1000 device days

  28. Safety CalendarWelsh 1000 lives campaign I Developed by Annette Bartley

  29. Welsh Patient Safety Project

  30. Measuring HAI For measure ‘rare’ events (occur < 10%) The concept of ‘days between’ infections

  31. Off the internet, Google pictures

  32. Off the internet, Google pictures

  33. Off the internet, Google pictures

  34. Off the internet, Google pictures

  35. Maternal deaths – Malawi For the “NO Maternal Death” Campaign a colorful, laminated A4 paper that said “Days without a Maternal Death: ______”. were hung in every Labour Ward for all (providers, patients and guardians) to see and the number was filled in daily with a dry erase marker

  36. Days between icecreams 25 Days between icecream 20 15 10 5 1st 2nd 3rd 4th 5th Icecream

  37. Days between events (infection) 25 Days Between events (eg Infection) 20 15 10 5 1st 2nd 3rd 4th 5th Sequence of events (eg Infection)

  38. Neonatal deaths – Malare Health Centre, 5’s Alive! Project, Ghana I

  39. Measuring rare events and time-between measures. James Benneyan IHI I

  40. ICU: Sequence of VAP infections by date 2010

  41. Use the tools to Display the data

  42. Days Be-tween Infection Sequence of Infections # Days since last infection Date of infection

  43. So far we have: • Mapped the size of the project in your facility • Prioritise a unit and bundle to start with • Written an aim

  44. Now, write down: • Your aim • Process Measures(Bundle compliance) • The outcome measures • Rate = numerator/denominator (describe) • Days between • Welsh Safety Cross calendar • Other • How you will feedback the data every month to • The frontline staff • Management • Mark with a * areas that you want to strengthen

  45. Improving your Outcome Measure 1) Numerator Standardised diagnosis of infection 2) What is the measure for HAI? Rate = Infection/device day Days between (CLABSI, VAP, UTI) Days or cases between SSI 3) Collecting and collating data: What (definition)/ Where/ How (tools)/ Who/ When 4) Presenting the data: Format - Safety Cross, Graphs Feedback/presentation - Management platform

  46. Note the areas that need strengthening • Your aim • Process Measures (Bundle compliance) • The outcome measures • Rate = numerator/denominator (describe)* • Days between • Welsh Safety calendar* • Other • How you will feedback the data every month to • The frontline staff * • Management * • * Areas that need strengthening

  47. Establishing or Improving your outcome measure/s • Select a priority area for improvement • resolving it will have a big impact • it is under your control to test a change • you can start on Monday

  48. PLAN DO ACT STUDY Plan a PDSA using the Model for Improvement What are we trying to accomplish? aim What can we change that will result in an improvement? How will we know that a change is an improvement? change measurement

More Related