Purpose of this presentation. Overall Project Objectives Proof of Concept How to Make Comments. Overall Project Objectives. Re-platform the system Additional Reports Simplify the process. Side by Side Comparison. Common Path Before Common Path Now. Proof of Concept.
E N D
Purpose of this presentation • Overall Project Objectives • Proof of Concept • How to Make Comments
Overall Project Objectives • Re-platform the system • Additional Reports • Simplify the process
Side by Side Comparison Common Path Before Common Path Now
Proof of Concept • Comments January 10 through January 24, 2007 • Activity Set-up/ Completion, Grantee/ Subgrantee, Grant/ Subgrant • Get comfortable with the interface • Verify the design • Identify Infrastructure issues
Proof of Concept What the POC HAS • Create/Complete Activities • Create/ Edit Subgrantees • Real Data for activities and grants • Some of the online Help What the POC Doesn’t HAVE • No Activity Funding/ Drawdown • No connection to LOCCS (vouchers) • No reports • No receipt functionality
How to Make Comments • Must be able to log into the system - Use your IDIS ID • Find an issue that needs a comment • Follow the links to Registerfor the Bulletin Board • Type in your comments • Comments will be collectedfrom the bulletin board
Commenting • Free-form comments • Execution of a Scenario • Comment on the appropriate Threads
Need More Help? • Call the Technical Assistance Unit at: 877-483-8282 • eMail the Technical Assistance Unit at idis_help@hud.gov
Next Steps (Short-term) • I will reply to your comments in the bulletin board • All bugs will be fixed • Usability issues will be evaluated Next Steps (Long-term) • UAT will begin Spring • First Roll-out Summer • Second and Third Roll-outs to follow