SAFETY rive de gier. SAFETY rive de gier. REGULATORY Actions. I llustrations. Lifting bridge set to standards in hall1. Emergency plan. Fire extinguisher training. SAFETY rive de gier. Report of losses. MONTHLY MEETING. 13 Actions. MANAGEMENT + HEALTH & SAFETY COMMITTEE +
E N D
Illustrations Lifting bridge set to standards in hall1 Emergency plan Fire extinguisher training
Report of losses MONTHLY MEETING 13 Actions MANAGEMENT + HEALTH & SAFETY COMMITTEE + EMPLOYEES Safety rounds safetycommittee 11 rounds Hazard List Finalized 2008 Specific points 450m² slab Coiling workstation
Illustrations Moving of the mechanical bender and the creation of a form storage workstation Renovation of around 450m² of floor surface
Illustrations New protective gloves to prevent cutting Bitumen repaired in front of the canteen Storage rack support protection Assembly table
HYGIENE QUARTERLY MEETING MANAGEMENT + HSC MEMBERS + WORK DOCTOR + WORK INSPECTOR + CRAM TECHNICAL ADVISOR SAFETY HSC WORKING CONDITIONS RESULTS 2009: 20 ACTIONS
Illustrations Feed conveyor replacement on the tapering machine Modification to the safety guard, spindle on the polishing machine Noise reduction
DAILY WORK DANGEROUS SITUATION OR OPERATOR REQUEST SELECTIVE ACTIONS RESULT 2009: 18 ACTIONS
Illustrations Placing of a chase to limit the number of cables of the floor surface Placing of fencing in front of the oil recuperation pit Formalization of machine cleaning procedures
DAILY WORK ACTIONS IDENTIFIED BY THE 10 5S GROUPS 5 S Actions RESULT 2009: 18 ACTIONS
YARD ENTRANCE SIDE Elimination of billet stocks Elimination of unnecessary chassis ( before )
Arms storage before after Tidying + New storage systems