An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAFETYrive de gier

  2. SAFETYrive de gier

  3. REGULATORY Actions

  4. Illustrations Lifting bridge set to standards in hall1 Emergency plan Fire extinguisher training

  5. SAFETYrive de gier

  6. Report of losses MONTHLY MEETING 13 Actions MANAGEMENT + HEALTH & SAFETY COMMITTEE + EMPLOYEES Safety rounds safetycommittee 11 rounds Hazard List Finalized 2008 Specific points 450m² slab Coiling workstation

  7. Illustrations Moving of the mechanical bender and the creation of a form storage workstation Renovation of around 450m² of floor surface

  8. Illustrations New protective gloves to prevent cutting Bitumen repaired in front of the canteen Storage rack support protection Assembly table

  9. SAFETYrive de gier

  10. HYGIENE QUARTERLY MEETING MANAGEMENT + HSC MEMBERS + WORK DOCTOR + WORK INSPECTOR + CRAM TECHNICAL ADVISOR SAFETY HSC WORKING CONDITIONS RESULTS 2009: 20 ACTIONS

  11. Illustrations Feed conveyor replacement on the tapering machine Modification to the safety guard, spindle on the polishing machine Noise reduction

  12. SAFETYrive de gier

  13. DAILY WORK DANGEROUS SITUATION OR OPERATOR REQUEST SELECTIVE ACTIONS RESULT 2009: 18 ACTIONS

  14. Illustrations Placing of a chase to limit the number of cables of the floor surface Placing of fencing in front of the oil recuperation pit Formalization of machine cleaning procedures

  15. SAFETYrive de gier

  16. DAILY WORK ACTIONS IDENTIFIED BY THE 10 5S GROUPS 5 S Actions RESULT 2009: 18 ACTIONS

  17. YARD ENTRANCE SIDE Elimination of billet stocks Elimination of unnecessary chassis ( before )

  18. Arms storage before after Tidying + New storage systems

  19. Storage runners before after Cleaning of circulation area Identification on the ground and containers