1 / 21

Lawrence Berkeley National Lab

Lawrence Berkeley National Lab. ASP Workshop 2013 September 23-26, 2013 Asheville, North Carolina Presented by Robert Fox. Approximately 25% of Lab Facilities are Offsite. Joint Center for Artificial Photosynthesis. LBNL Main Site. Operations Offices. Joint Genome Institute.

kelsey-long
Download Presentation

Lawrence Berkeley National Lab

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lawrence Berkeley National Lab ASP Workshop 2013 September 23-26, 2013 Asheville, North Carolina Presented by Robert Fox

  2. Approximately 25% of Lab Facilities are Offsite Joint Center for Artificial Photosynthesis LBNL Main Site Operations Offices Joint Genome Institute Life Sciences NERSC Biofuels 5 0 SCALE: MILES

  3. Lawrence Berkeley National Laboratory Environment / Health / Safety DIVISION

  4. Lawrence Berkeley National Laboratory • First National Lab, founded in 1931 • Six Major National User Facilities • Conducts research in physics, chemistry, materials, biosciences, energy technologies, environment, and engineering Lab Budget • FY12 $819M • FY13 $826M estimate • FY14 $764M estimate Environment / Health / Safety DIVISION

  5. Construction Projects Underway at LBNL • Computational Research and Theory (CRT) Facility – UC Funded • General Purpose Laboratory (GPL) • Solar Energy Research Center (SERC) – UC Funded • Facility for Low Energy Experiments (FLEXLAB) • Old Town Demolition Project – partially funded Environment / Health / Safety DIVISION

  6. Computational Research and Theory Facility Environment / Health / Safety DIVISION

  7. Computational Research and Theory Facility Environment / Health / Safety DIVISION

  8. General Pupose Laboratory Environment / Health / Safety DIVISION

  9. General Purpose Lab – Near Completion • Add text, image or chart here • Add text, image or chart here Environment / Health / Safety DIVISION

  10. Solar Energy Research Center Lawrence Berkeley National Lab 10

  11. Solar Energy Research Center • Add text, image or chart here • Add text, image or chart here Environment / Health / Safety DIVISION

  12. Facility for Low Energy Experiments in Buildings FLEXLAB Environment / Health / Safety DIVISION

  13. Facility for Low Energy Experiments in Buildings FLEXLAB Environment / Health / Safety DIVISION

  14. Berkeley Lab Environmental Monitoring • Analytical services depending on FY13 budget may have to be reduced slightly for VOCs measurements at the groundwater treatment systems, and monitoring for some radioactive materials in wastewater discharges and ambient air may be eliminated. Environment / Health / Safety DIVISION

  15. Berkeley Lab Groundwater Plumes Environment / Health / Safety DIVISION

  16. Berkeley Lab Waste Management • Analytical services will remain steady for sample analyses driven by LBNL’s TSDF permit’s Quality Assurance program. Samples come from support services and research waste streams. Environment / Health / Safety DIVISION

  17. Berkeley Lab Generated Waste TSDFs used include • Energy Solutions • Permafix, Inc. (Florida & Tennessee) • Facilities include several subcontracts as well as one DOE system-wide master subcontract (DOE Ohio). Environment / Health / Safety DIVISION

  18. Berkeley Lab Projected Use Analytical Labs • FY13 $195K • FY14 $195K TSDF • FY12 0 cubic meters [No low-level waste or mixed waste was shipped in FY12 since not much radioactive waste was generated and funding for disposal was limited. ] • FY13 4.44 cubic meters [3.68 m3 routine low-level waste, and 0.76 m3 mixed waste] • FY14 Same as FY13 Environment / Health / Safety DIVISION

  19. Berkeley Lab FY14 DOECAP Participation Auditor commitment for analytical lab audits Organic 1 Radiochemistry 1 Inorganic 1 • LBNL supplies 1 auditor for every $65,000 in analytical services Auditor commitment for TSDF audits Environmental Compliance 1 Waste Operations 1 Environment / Health / Safety DIVISION

  20. Lawrence Berkeley National Laboratory Environment / Health / Safety DIVISION

More Related