Título del proyecto

Título del proyecto. MH Los Arcos - Grupo Industrial La Italiana S.A. de C.V. Nombre. Departamento. Scheduling. Imagen relacionada con el proyecto. Nombre del proyecto. Planta: Los Arcos Process Owner : ---------- Proceso:. D. M. A. I. C. Declaración del problema. Cuantificar….

kenda
Download Presentation

Título del proyecto

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Título del proyecto MH Los Arcos - Grupo Industrial La Italiana S.A. de C.V. Nombre Departamento

  2. Scheduling Imagen relacionada con el proyecto Nombre del proyecto Planta: Los Arcos ProcessOwner: ---------- Proceso:

  3. D M A I C Declaración del problema • Cuantificar… Imagen relacionada con el proyecto Imagen relacionada con el proyecto

  4. D M A I C Objetivo del proyecto • Eliminar… • Garantizar… • Reducir… Imagen relacionada con el proyecto Imagen relacionada con el proyecto

  5. D M A I C Proceso yb: costo… yp: paquetes con defectos

  6. D M A I C y’s y validación del SM YC1= ------------- (MXN) YB1 =----------- (PPM) YB2 = ----------- (USD) YP1= ---------------- (m) YP2= ----------------- (PPM) YP3= ---------------- (PPM) YB1: ------ (MXN) YP1= Push out force (Nw) YP3= Deformed bushing (PPM) YP2= Burrs presence (PPM) Calibration certificate (Destructive Test) Attribute MSA accepted Dimensional Report for Gage GO / No GO

  7. D M A I C Análisis de capacidad yp1: ------------------ Nivel Sigma:-0.51 DPMO = 696279 PPM

  8. D M A I C Análisis de capacidad

  9. D M A I C Identificación de causas (X’s) YP1= Push out force (Nw) YP2= Presence of burrs YP3= Deformed bushing Causaspotenciales: X1 – Non defined welding parameters X2 – Reworked electrodes X3 – Different Method between Shifts X4 – Electrode not parallel X5 – Electrode not perpendicular X6 – Misaligned electrodes X7 – Method to place piece in welder

  10. D M A I C Validación de causas X6 Misaligned electrodes (concentricity) YP3 6 measurements around electrodes pulled together 1 sample-t Ho: the angle at which electrodes are pulled together is 90° Ha: the angle is different to 90° Null hypothesis is not rejected Electrodes are notmisaligned

  11. D M A I C Matriz de causas verificadas X1  DOE X2 & X7 verified significant X3, X4, X5, & X6 verified not significant

  12. LEGEND Very effective, easy to implement, low cost Moderately effective, Moderately easy to implement, Moderate cost Not very effective, Hard to implement, High cost D M A I C Matriz de mejoras Conteractions: X1 – Establish optimal parameters through DOE X2 – Define the useful life of electrodes

  13. D M A I C Soluciones Análisis por ANOVA, DOE Factorial, Superficie de Respuesta, CDC, etc…

  14. D M A I C Controles “Welding Parameters Register” form updated. Parameters are audited every 14 days. “Set up sheet” now includes the parameters at which the machine should be working.

  15. D M A I C Medición posterior a las mejoras

  16. D M A I C Nuevos niveles Sigma