90 likes | 225 Views
Objective ITY-AGDL. ESSIP Plan 2014. Adriatik KOKONA DSS/EIPR 19.09.2014. Comprehensive Explanation (1/3). This OBJ covers the implementation of initial data link services based on air-ground (ATCO Pilot) point-to-point data communications as specified by Regulation
E N D
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014
Comprehensive Explanation (1/3) • This OBJ covers the implementation of initial datalink services based on air-ground (ATCO Pilot) point-to-point data communications as specified by Regulation • 29/2009 EC (data link services). • Scope: EU+ States = EU+CH+NO+ECAA • MIL:Only 1 non-mandatorySLoA on State a/c equipage ESSIP Plan 2014 / Objective ITY-AGDL
Comprehensive Explanation (2/3)(=> Mandatory REG and ASP related SLoAs) ESSIP Plan 2014 / Objective ITY-AGDL
Comprehensive Explanation (3/3)(=> Non-mandatory SLoAs) ESSIP Plan 2014 / Objective ITY-AGDL
Link to European ATM Master Plan • [AUO-0301] - Voice Controller-Pilot Communications (En Route) Complemented by Data Link; • [CTE-C2a] - Air-Ground existing data link (VDL2 and AOA); • [ER APP-ATC154] - Basic air-ground data link communications service derived from the CM and CPDLC applications; • [PRO-044b] - ATC Procedures involving protocol for utilization of Data Link communications, message composition, receipt acknowledgement; • [ER APP-ATC119] - Enhance Air/Ground Data Communication for Step 1 CPDLC. ESSIP Plan 2014 / Objective ITY-AGDL
Finalisation Criteria and Closed Questions • Various – see detailed breakdown in ESSIP Plan 2014. ESSIP Plan 2014 / Objective ITY-AGDL
Supporting Material • Various – see ESSIP Plan 2014 ESSIP Plan 2014 / Objective ITY-AGDL
ESSIP Report 2013 • Only three states out of eight, the airspace of which belongs to the Part A of the regulation, with a deadline of 02/2013, have completed the objective. Most of the states, the airspace of which belongs to Part B, with regulated completion deadline 02/2015, and ECAA States, have planned to implement the objective, within the deadline, except three states which have not yet developed any plans; • Four States have reported the objective Completed and fifteen have planned to complete the objective within the ESSIP deadlines while twelve States have reported it Late. 6 States reported not yet plans developed for implementation. ESSIP Plan 2014 / Objective ITY-AGDL
Links and contacts • Objective Coordinator: Adriatik Kokona, +32 2 729 3556 adriatik.kokona@eurocontrol.int • DNM Objective Expert(s): SorenDissing , +32 2 729 3446 soren.dissing@eurocontrol.int ESSIP Plan 2014 / Objective ITY-AGDL