ESTIMATING PROJECT COST Ismu Kusumanto Jurusan Teknik Elektro UIN Sultan Syarif Kasim Riau. TIPE COST. Direct Cost - Labor - Material - Equipment - Other 2. Project Overhead Cost 3. General & Administrative Overhead Cost (max 20 %). Allocating Costs using the WBS.
E N D
ESTIMATING PROJECT COSTIsmu KusumantoJurusan Teknik ElektroUIN Sultan Syarif Kasim Riau
TIPE COST • Direct Cost - Labor - Material - Equipment - Other 2. Project Overhead Cost 3. General & Administrative Overhead Cost (max 20 %)
WORK PACKAGE ESTIMATES WP Description : Final Version Page 1 of 1 WP ID : 1.1.3.2 Project PC Proto Deliverable : Circuit board Date 09122008 Original Unit : Software Estimator IK WP Duration : 3 work weeks Total Budget $ 265 Time Phased Budget Work period