An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MS results – IT 3684 by Elena Perez Rodriguez

  2. Index • Firms contacted • Summary of the results • Idom • Herco • Telstar • Discussion Thermosiphon project

  3. Summary of the results • 69 firms where contacted form 17 European countries. • 8 firms answered the Market survey. • 5 firms have been qualified. • 1 firm has to be discussed. • 2 firm are non qualified. Thermosiphon project

  4. Summary of the results Thermosiphon project

  5. Idom • Criteria that is not fulfilled • Provide at least two references of successful design, construction, installation and commissioning of similar chiller installations done in the last five years. The references provided are out of scope. Thermosiphon project

  6. Herco • Criteria that are not fulfilled • Provide at least two references of successful design, construction, installation and commissioning of similar chiller installations done in the last five years. The references provided are out of scope. • 15 FTE (full time equivalents) engineers and technicians in the design and construction of cooling systems during the last three years The number of people in the firm is 9 ÷ 5 FTE They have never done cascade systems Thermosiphon project

  7. Telstar • Criteria that is not fulfilled • Provide at least two references of successful design, construction, installation and commissioning of similar chiller installations done in the last five years. Only ONE reference provided • They have only • done cascade • systems once Thermosiphon project

  8. Discussion Qualified suppliers Thermosiphon project