1 / 4

TB model for the 2008 FNAL test beams

This presentation discusses the progress of implementing the 2008 test beams, including the need for new test beam models and information on detectors and alignment.

kento
Download Presentation

TB model for the 2008 FNAL test beams

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TB model for the 2008 FNAL test beams Fabrizio Salvatore, RHUL CALICE meeting, Manchester, September 9th, 2008

  2. TB layout • Drivers for most of the beam detectors are already available • Need to create new test beam model in db to define the position of all the detectors • Adopt the convention of (0,0) being the back face of DC1 X,Y = (0,0) Fabrizio Salvatore, RHUL

  3. Work in progress… • No info available at present on the wire chambers in front of T100A • Need to know about gas mixture, composition of the entrance/exit windows, etc… • SiWECAL needs new driver (Gabriel ?) • Need to add the new instrumented layers in lower slabs • AHCAL/TCMT same as CERN 2007 tb • No information on what detectors are present on the beam line beyond the wire chambers • Cerenkov ? Any other beam chamber we know of ? • No detail information on alignment • From Erika: “The two 10x10 triggers are aligned with the windows of two of the four DC. Any mis-alignment of the DC will also result in a mis-alignment of the triggers”. • Which two of the 4 DCH ? What is the mis-alignment ? Are all the other chambers aligned with the beam line ? Or with a different ref. point ? Fabrizio Salvatore, RHUL

  4. Conclusion • Implementation of the 08 test beam is in progress • A lot of detectors on the beam line are already simulated in Mokka • Need to implement new positions in the db • Still missing information regarding extra material on the beam line • Wire chambers ? Cerenkov ? AOB ? • No information on alignment • In previous TB models we always assumed perfect alignment in the simulation • If mis-alignment needs to be included at simulation level, need to know reference points wrt where detectors were aligned • No driver available for ScECAL • If beam line detectors are the same for the ScECAL run, only need SciECAL driver and new detector positions Fabrizio Salvatore, RHUL

More Related