An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMMISSIONING MEETING – JUNE 2008 - W3 PS/SPD STATUS Last week summary: DAQ path: • Not much done because of ECS maintenance and power cut recovery. • Next window for large cosmics run is next week. • Two FEBs (PRS_3) have been replaced because showing significant BER for SPD VFE. Reason is not understood. Replacement fixed the pb (at least slot1). • The absence of half of the C-side in muon runs was actually HV-related. A non-ambiguous use of the HV project has to be settled. Cosmics analysis: • The 77 k cosmics run (among which about 2/3 were unuseful L0Muon triggers) are currently being analysed (Miriam and Ricci). • Mapping is now OK. • Xcal track extrapolation works. • Time-alignment study is under development. Results are encouraging so far. . PS/SPD COMMISSIONING

  2. COMMISSIONING MEETING – JUNE 2008 - W3 PS/SPD STATUS Last week summary: Noise analysis PRS: • 6016 channels measured. Most are OK (>99%). • Spots the problems: • Some channels have pedestals > 255 (6) => cannot be corrected at 0. • We do see FE/VFE connection problems.(32 among which 6 A-side). • 2 1/2 VFE are off (one in each side). Trigger path: • We had worries about the BCIDs alignment within TRIG_PGA. Demonstrated to work now. • For half-cards: TRIG_PGA needs the 2 ECAL infos (arghh). Fixed by sending the same ECAL board info. This adds 12 cables (already in). • « reasonable » phasers ranges obtained for the ECAL data sampling (6-9 ns). • We retrieved the expected latency value between PRS and ECAL. • PRS data read out in the TVB. PS/SPD COMMISSIONING

  3. COMMISSIONING MEETING – JUNE 2008 - W3 PS/SPD STATUS This week: • Continue the data analysis: • Time alignment. • Noise. • Huge PRS events (There, I guess it is a matter of L0 trigger close to the VFE reset.) • Include PS and SPD in the L0Calo path: • Principles established. • Define ranges of sampling for SPD/PRS data in the TVB. • Check w/ synchronous Rams the whole path (SPD/PRS 2X2 + SPD mult). • The only window for large cosmics run (before GCW) will be next week. This is the week of the calo commissioning meetings. Busy times. PS/SPD COMMISSIONING