PFV – Roadmap To Trial Period

PFV – Roadmap To Trial Period. IDCWG Update. Road Map To Development. CO’s Development. GTL CO’s Draft. WEQ 008 Assessment . CO 283 Report. Data Submission. Key Assumptions: WEQ 008 is approved by December 2013 Agreement for funding of the Change Order required is in place by June 2014

kera
Download Presentation

PFV – Roadmap To Trial Period

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PFV – Roadmap To TrialPeriod IDCWG Update

  2. Road Map To Development CO’s Development GTL CO’s Draft WEQ 008 Assessment CO 283 Report Data Submission • Key Assumptions: • WEQ 008 is approved by December 2013 • Agreement for funding of the Change Order required is in place by June 2014 • IDCWG SC support of the CO’s development by March 2014

  3. Road Map Breakdown • Data Submission (September 2013) • GTLSetGeneratorMW – 100% of the data is required. • GTLSetLoadZoneMW – 100% of the data is required. • GTLSetBranchflow – less than 100% of the data is required. All major tielines and major flowgate components are required – it is expected that this data is increased moving forward past September • GTLSetParTap - 100% of the data is required. • GTLSetDCline - 100% of the data is required. • CO 283 Report (December 2013) • Validate PFV against real time flows • Alter modeling to minimize unaccounted flow deemed necessary. Iterate data groupings and calculation to attain acceptable unaccounted flow. • WEQ-008 Assessment (February 2014) • Provide BPS with update document detailing the following, • Complexity of each item (Dev, Test, Implementation and Maintenance) • Each system component Impact (BOF, IDC, SDX) • Impact by Entity types (RC, BA, TSP, PSE, LSE) • Updated IDC user manual – Detailing how IDC will behave under the given methodology. • Updated SDX user manual – Detailing how SDX will look like under the given methodology.

  4. Road Map Breakdown – Cont’ • GTL Change Order’s Draft (April 2014) • Draft and agree on all required change orders needed to successfully implement the PFV methodology. • CO’s must be presented to ORS and IDC Steering Committee for approval. • IDCWG will work with BPS to ensure that the CO’s encompass the intent of the standards. • Change Order Development (July 2014) • Give OATI the “green light” to start development. • Assumptions: • Funding agreements are in place • IDCWG, ORS and SC approval

  5. Road Map To Trial Period Implement CO’s Start of Trial Period Testing Result Report Testing

  6. Open Discussion