STATUS of 6m ANTENNA BASE

A sturdy base design featuring a steel box beam structure for a 6m antenna. Includes lifting & locate points for easy transportation, a doorway, windows for light & air, and a trap door for fiber connections. |

kerika
Download Presentation

STATUS of 6m ANTENNA BASE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STATUS of 6m ANTENNABASE Matt Fleming 8/24/04 Note 6m = BIMA

  2. BASE DESIGN 1 steel box beam structure 106 x 106 x 48” ( fits truck ) 4 bolt on legs 48” long ( field assembly ) 4 lifting & locate points for transporter 4 jacks ( maybe 3 ) 3 point support of 6m antenna pedestal 1 doorway 24 x 39” 2 windows for light & air 1 trap door in floor 24 x 36” Enclosed space for making fiber connections. Trap door in floor allows full access to vault below.

  3. JACK CONCEPT 10m BASE

  4. JACK CONCEPT 6m BASE J25 Jacks 36 x $2,800 = $100,800 jacks 4 x $500 = hand gear crank Custom Jack 36 x $750 = $27,000 jacks 4 x $3,000 = $9,000 motors

  5. PREFERED CONCEPT • Use design shown in –D- • Use portable air bag or portable hydraulic if needed • Eventually develop 3 drive units for more convenience.

  6. TASKS REMAINING FOR BASE • Conceptual Design, complete. Done • Alternate Jack design, complete. Sept. 3 • Detailed design, complete. Sept. 9 • Finite Element Analysis, begin. Sept. 18 • Finished shop drawings, complete. Oct. 18 • Request for Quote sent, UCB Purchasing. Nov. 12 • Contract prepared & awarded, UCB Purch. Dec. 13 • Fabrication & delivery, complete. Feb. 25