280 likes | 358 Views
JINR Status Report on PANDA Muon System G.D.Alexeev on behalf of Dubna team, ITEP, Moscow, April 18, 2008. Present conceptual view of PANDA Muon System based on RS Target Spectrometer: * MC model setup * pi/mu separation * multiple scattering
E N D
JINR Status Report on PANDA Muon SystemG.D.Alexeev on behalf of Dubna team, ITEP, Moscow, April 18, 2008 • Present conceptual view of PANDA Muon System based on RS • Target Spectrometer: * MC model setup * pi/mu separation * multiple scattering • Second coordinate r/o: * signals * electronics • Forward Spectrometer: * MC model setup * multiple scattering * RS in function of HCal: - RS 'stand alone' response to hadrons - combined calorimetry ECal + RS
HMI/RS µ - Filter Dipole RICH ECAL Target Spectrometer PANDA Muon and Hadron Detection in PANDA by Range System
MC model setup for Target Spectrometer ECal Solenoid Range System μ 0.8 GeV
Muon scattering and straggling at 0.8 GeV ECal Solenoid Range System μ 0.8 GeV Beam dia. 170 mm Muon straggling
Anode and induced strip signals from MDT Trace 1: Anode signal, K≈60 mV/μA Trace 2: Strip signal, inverted, K≈480 mV/μA
MDT signals analog R/O of the PANDA MUON TRACKER AA-QTC card 16 ch Serial data Interface Signal QTC TDC Ampl 8.3 Ampl 8.3 16ch THRout THRin Q I in I out ` TIME • Analog R/O for MDT (strips &/or pads) • Using well known Wilkinson principle for Charge-to-Time Conversion • Using TDC chip as proven solution for pipe-line R/O
MC Model for Forward Spectrometer Hadron & Muon Identifier based on RS (HMI/RS) instead of HCal ECal / Shashlik HMI / RS 7 GeV 380 layers (Sci. 1.5mm + Pb 0.3 mm) 16 layers x 6cm /Fe interleaved with MDTs
Muon scattering in Forward Spectrometer ECal HMI / RS μ 3 GeV
Stand alone (no ECal) HMI / RS response to hadrons Analog signal “Digital” signals (hits) Better than analog mode!
Energy Deposition in ECal + HMI/RS for 7 GeV Pions Events with different energy deposition ratio between ECal and HMI/RS
Combined Calorimetry Calibration for ECal + HMI/RS Pion beam, 7 GeV Scatter plot Averaged calibration ECal signal, MeV HMI/RS signal, hits Energy, MeV
Combined Calorimetry Calibration for ECal + HMI/RS Antiproton beam, 7 GeV Scatter plot Averaged calibration ECal signal, MeV HMI/RS signal, hits Energy, MeV
Combined calorimetry ECal + HMI/RS:Reconstructed vs Deposited Energy Antiprotons, 7 GeV Pions, 7 GeV reco reco depo depo
Conclusions: • TS - generally understood, ready for r/o optimization • FS - HMI/RS looks adequate solution Plans: • GEANT model for RS in TS -> pending final yoke design • MC optimization of HMI/RS • Prototyping - RS and second coordinate r/o -> pending money