An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OWASA – UNC Water Reuse System Project: A Technical and Financial Partnership to Promote More Sustainable Water Management

  2. About OWASA… • Serve ~80,000 people, 20,000 accounts • ~ 9 mgd average-day demand (UNC ~ 2.4 mgd) • 3.4 billion gallon reservoir system • ~11.5 mgd safe yield • 20 mgd WTP • 14.5 mgd WWTP

  3. Jones Ferry Road WTP Mason Farm WWTP

  4. OWASA was created in 1977 • Water and sewer utilities were previously owned & operated by Carrboro, Chapel Hill and UNC • Contractually obligatedto meet the water/sewer needs of the Towns and University as determined by the Towns and University

  5. 2002 Drought Was Call for Action Board-adopted goals for sustain-ability, environmental responsibility, and water conservation and reuse OWASA’s water conservation program is part of our long-term supply plan – not simply short-term drought response management Water reuse a very key strategy

  6. Demands Have Been Stable

  7. UNC’s Peak Demand Ratios are Higher Than Our System-wide Peaking Ratios

  8. Is Water Reuse Feasible? • Initially Evaluated in 1995 – Not Pursued • 2002 Drought Led to Joint Re-evaluation • 2003-2005 Study • Technical, economic, and environmental feasibility analysis • Pilot-scale testing • Microbiological study • Mason Farm WWTP upgrade underway • UNC main campus expansion underway

  9. Cogeneration Plant Cooling Tower South Chiller Cooling Tower OWASA-UNC Reuse Project • Feasible for use in cooling towers • Feasible for irrigation use, toilet flushing • Other uses may also be possible

  10. Reclaimed Potable Total Reclaimed Water Water Demand as % of (mgd) (mgd) (mgd) Total 2009 0.66 8.21 8.87 7.4% 2028 1.94 10.96 12.90 15% Potential Reuse Demands* vs. Projected Potable Water Demands * Demands shown are for cooling tower make-up water and irrigation uses, only. Potential demands may be higher if other uses are met through reuse. Water reuse may also be a strategy for meeting Carolina North water needs, but that potential is not reflected in the above table.

  11. General Layout of the Planned Water Reuse System

  12. Peak Day Demands – No Reuse

  13. Reuse Defers WTP Expansion

  14. Reduction in Water Revenue • Year 1 • 660,000 gpd loss in potable sales • > $1,000,000 revenue reduction in Year 1 • Direct costs only reduced by $380,000 (Less energy and chemicals for potable water) • ~ 3.6% increase in water rate needed to balance water revenues • Projected RCW rate of @ $2.40/1,000 • > $466,000 direct/indirect O&M costs

  15. Deferred Capital Costs • Could defer 5 capital projects for several years through reuse/conservation • Net Present Savings of project deferrals > $3,000,000 in next 9 years • Potential deferral/elimination of > $40 million to go to Jordan Lake

  16. OWASA-UNC Reuse Project • Sustainable management strategy • Save drinking water for human use • Reduce community’s risk to droughts • Reuse supply less vulnerable to drought • Locally controlled source • Reduce discharge of nutrients Reuse is cost-effective, safe and reliable approach for meeting multiple objectives

  17. UNC • > $10,000,000 for Phase I • $1.866 million CWMTF grant • $0.625 million EPA grant • Payback < 10 years • UNC pays $5.85/1,000 gallons for all potable water use during May-Sept. and $3.08/1,000 gallons in all other months

  18. OWASA Positions… • Water customers cover revenue loss • No subsidy of RCW capital or O&M by customers • No reimbursement to UNC • OWASA owns and operates system • If RCW is down, UNC to pay for potable water at then-current water rate

  19. OWASA-UNC Reuse Project • OWASA-UNC reuse contract: April, 2006 • UNC to pay full cost (less grants) • Construction now underway • Pump station/storage tank at WWTP • 8,000 ft. of 24-inch main to south campus • Phase I: 7,000 ft. of pipe on main campus • Projected Start-up: March 2009

  20. Is Reuse in Your Future? • Rates • Non-potable demands (current/future) • Proximity of demands • WWTP capability • Supplemental funding • Full cost recovery may not be possible • Incentives for reuse may be needed

  21. Thank You If you would like more information about the OWASA-UNC reuse project or OWASA’s conservation efforts, please contact: Patrick (Pat) Davis Utility Manager OWASA P.O. Box 366 Carrboro, NC 27510-0366 Telephone: 919-537-4210 (Direct) Email: pdavis@owasa.org OWASA Website: www.owasa.org

  22. Increasing Block Rates for Residential Customers

  23. Full-Cost Recovery National survey (1) 34% of systems have performed a cost of service analysis Only about 14% of reclaimed water systems in US are fully recovering their RW system costs (1)AWWA/WEF Water Reuse Rate Survey presented by Ken Thompson at 2004 Water Sources Conference, January 2004 Financial Goals

  24. Monthly Water Use by Residential Customers