The Version 6 Rollercoaster!! David McDonald BEng, MIET Maximo UK & Ireland User Group

The Version 6 Rollercoaster!! David McDonald BEng, MIET Maximo UK & Ireland User Group 12 th November 2008. Outline. Introduction Motives for development, future work, roadmap etc. Structure of project wrt NIS / IBM / NIE. Version 6 Project – Key points

khalil
Download Presentation

The Version 6 Rollercoaster!! David McDonald BEng, MIET Maximo UK & Ireland User Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Version 6 Rollercoaster!! David McDonald BEng, MIET Maximo UK & Ireland User Group 12th November 2008

  2. Outline • Introduction • Motives for development, future work, roadmap etc. • Structure of project wrt NIS / IBM / NIE. • Version 6 Project – Key points • Roll-out plan, including training programmes, Maxdemo test (including full trial demanded from IBM), timescale. • Version 6 – The Highs & Lows • Maximo Mobile • Long term Strategy

  3. Northern Ireland Electricity • NIE is part of the Viridian Group, owned by Arcapita. • Viridian turnover was £1022M in 2007, with NIE contributing regulated income of £166M. • NIE has sole responsibility for Transmission and Distribution of electricity to 790,000 customers in Northern Ireland. • NIE Infrastructure (the wires business) includes Customer Operations, Lines & Cables Product, and Plant Product.

  4. Viridian Group PES Contracting NIE Energy NIE Infrastructure Huntstown Power Energia Plant Customer Operations Lines & Cables Networks Maximo Group Structure

  5. Plant Product • Designs, constructs and maintains substations across Northern Ireland. • Installed network:- • 8 275/110 kV (with 3 new sites planned) • 40 110/33kV Substations • 210 33/11kV Substations • 8,500 Secondary Distribution (Ground Mounted) • Determines maintenance policy. Moving towards RCM / CBM policies and practices. • Maximo as Asset Register / Work Management system.

  6. Maximo in Plant Product • Introduced as version 3 in 1997 to bring together Distribution data (up to 33kV) from 3 legacy databases. • Upgraded in 1999 for Y2K compliance to version 4. • Transmission data (110kV and 275kV) transferred from En Garde in 2002. • Integrated with Job Management System in 2004. • Delivered via Citrix in 2005. • Upgraded in 2008 to version 6.2.1. • …and much more to come!

  7. NIE -Why upgrade to Version 6? • Requirements to comply with Legislative, regulatory and Auditory requirements. • Improved Substation Inspections and Defect Management • Maximo Version 4.0.1 unsupported • Increased Functionality • Condition based Maintenance • Image and Document Management • Workflow & Work Scheduling • Protection & Control • Dashboard

  8. Version 6 Roadmap V7 CBM Links Databases » Maximo Maximo Mobile / Defect Management

  9. Version 6 Project • 3 stakeholders…NIE, IBM and Northgate Information Systems (NIS), the desktop provider for NIE. • Implemented in IE6 within a Citrix environment. • Circa. 50 users, across 7 locations. • ‘Train the trainer’ approach. NIS and NIE staff trained by IBM. NIE users then trained by NIE staff. • Rollout briefed across organisation. • Downtime limited to two working days.

  10. Hardware Maximo Citrix Users Citrix Server Application Server Actuate Server Database Server

  11. Configuration • Oracle triggers. Redefined in version 6, using Crossover Domains. • Training. Three sessions for every user, a sandpit, and post go-live handholding. • Actuate reporting. Conversion from Business Objects and Access. • Screen design. Fidelity with version 4, but also harnessing the additional features from version 6. • Organisational structure including user names.

  12. Training carried out in October 2007 Planned to take place 1 week before Go-Live Training completed with demo data Some major issues identified during training / testing Performance Print Issue Detailed Configuration Asset Catalogue The List Window Initial User Testing

  13. The List Window

  14. Change Control

  15. Version 6.2.2

  16. Revised Roll out Plan

  17. The List Tab Navigation User sign-on Company wide access Integration with other software Publishing of reports Saved Queries Start Centres Version 6 - The Highs

  18. Version 6.2.1 – The fix list (book!) The List Window Performance – Changing status & WO print slower than V4 Work Order print…how did we get rid of those pesky pop-ups? Install the known fix of course! Data Migration issues (Asset Catalogue & Asset Move History) Lines of communication Version 6 - The Lows

  19. Version 6 Roadmap V7 CBM Links Databases » Maximo Maximo Mobile / Defect Management

  20. Roadmap Prioritisation • Legislative requirement? Are we obliged to deliver certain elements to comply with legislation? • Regulatory requirement? What information does the regulator demand from NIE? • Business benefit? • Promotion of Maximo? • Effort…do we need to employ IBM or an IBM partner? Do we need to employ NIS or other business partner? • Cost. Not just in financial terms, but in terms of resources.

  21. Mobile Working • Approval and Sanction granted for Maximo Mobile • To replace 10,000 paper inspections per year. • 20 devices initially deployed, rising to 50. • Digital image collection, for immediate action on defects. • 3G infrastructure, backed up by docking as required. • Maps, diagrams, ISO procedures in the field. • May move towards GPS. • First pass removes clerical resource requirement of 1.5FTE.

  22. Mobile Devices

  23. TETRA Development • Terrestrial Trunked Radio (professional mobile radio and two way transceiver.) • Blue Light Services - Government Agencies and Emergency Response • Rolled out to Orange Light Services (utilities) • TETRA voice implemented in NIE 2007 • Used for all High Voltage Switching from site to Control centre • Intention to deploy Maximo via TETRA

  24. Defect Management • Coded, rather than free text, output from Mobile. • Defects attached to relevant assets and locations. • Escalations and Workflow used to route defects to the relevant resource. • Where defects are not resolved, Maximo provides escalation through the organisation. • Visibility of defect issues not currently available, and some of these defects will be safety critical. • Longer term – integrated GIS to allow effective area working.

  25. Version 6 Roadmap Lines V7 CBM Links Databases » Maximo

  26. Databases to Maximo

  27. Condition Monitoring

  28. Architecture On-Line Monitor Trip Coil Profiles Distribution Control On-line Oil Analyser Maximo PI Historian On-line Bushing Monitor Transmission Control DGA Oil Sampling

  29. Conclusions • Maximo 6 provides significant ‘out of the box’ functionality improvements that can be easily accessed by the end user for quick and powerful gain. • Mobile working elevates basic inspection tasks to new levels. Defect capture, prioritisation and resolution all gain major improvements. • Maximo 6 provides the platform for true Condition Based Maintenance. It provides the ability to integrate Plant and the Asset Management system, to harness real-time condition information, allowing maintenance decisions to be focussed and cost-effective.

  30. There are currently 20 upgrade projects to be implemented over the next three years NIE are keen to sign a 3 year framework contract to implement these 20 projects These projects will significantly improve Asset Management within NIE Expand Maximo to other parts of the business Long term Partnership

  31. Thank you for your attention! Questions? david.mcdonald@nie.co.uk