300 likes | 311 Views
The European Hull Database facilitates the exchange of hull data for inland navigation and ensures compliance with regulations. It aims to improve safety and efficiency in the industry.
E N D
European Hull Database Andreas Bäck Deputy Project Coordinator of PLATINA
Agenda Overview of PLATINA Overview of European Hull Database Reflection group on inland navigation 3
Agenda Overview of PLATINA Overview of European Hull Database Reflection group on inland navigation 4
PLATINA … • is a project within the 7th Framework Programme for Research, Technology Development and Demonstration • is aimed at coordinating and supporting research activities and policies • runs from 06/2008 to 05/2012 • consists of 22 partners from 9 different countries • is organised around the five NAIADES action areas • is strategically guided by key industrial stakeholders, associations and Member States administrations
Achievements until 06/2010 • Launch of European IWT information portal (www.naiades.info) • online version of the IWT Funding Guide in EN, FR, NL, DE (www.naiades.info/funding) • Good practice report I+II for the sector • Launch of an IWT innovation database • IWT strategic research agenda I • IWT education and training institutes and curricula • Preparation of organisational structure and support for the foundation of a European IWT educational network (EDINNA) • Analysis of the reputation of IWT and definition of the desired image • Brand essence summary • Training workshop on integrated waterway planning • Technical Specification for the Inland Electronic Navigational Chart (IENC) Register and digital parts of IENC standard • Release of RIS community portal
Further activities in 2010 • Extension and update of the IWT information portal • Draft strategy for harmonised IWT education and training standards in inland navigation (STCIN) • Work programme for the European IWT educational network (EDINNA) • IWT lead event on 30.11/1.12.2010 in Brussels • Strategic positioning of IWT’s reputation • Work programme of promotion & development agencies • Development of a strategic communication agenda • Inventory of strategic inland waterway projects • RIS reference data management systems • Publication of a best practice manual on waterway infrastructure planning following the Joint Statement
Agenda Overview of PLATINA Overview of European Hull Database Reflection group on inland navigation 10
Main Objectives of European Hull Database • Implement and operate pilot service to facilitate hull data exchange as indicated by Directive 2006/87/EC, RheinSchuO and Commission Regulation for Electronic Reporting • Prepare scenarios for full scale operation (2012 onwards) 11
Data to be processed (1/2) A. All crafts (according to 2008/87/EC and RheinSchuO) • Unique European Vessel Identification Number • Name of the craft/vessel • Type of craft • Length over all • Breadth over all • Draught • Source of data (= Community Certificate) • Deadweight for cargo vessels • Displacement for vessels other than cargo vessels • Operator • Issuing Authority • Number of Community Inland Navigation Certificate • Expiration date • Creator of dataset
Data to be processed (2/2) B. Where available (according to 2008/87/EC and RheinSchuO) • National number • Type of craft in accordance with the Technical Specification for Electronic Ship Reporting in inland navigation • Single or double hull in accordance with ADN/ADNR • Height as defined in Article 1.01 No 75 • Gross tonnage (for maritime vessels) • IMO number (for maritime vessels) • Call sign (for maritime vessels) • MMSI number • ATIS code • Type, number, issuing authority and expiration date of other certificates’
Schematic overview (Reserved for future purposes) 14
Two ENIs for one craft? Information to JWG (10) 5 from 25.1.2010 Meanwhile solved thanks to effective cooperation of authorities
System Implementation (1/2) Implementation and operation of the European Hull Database: • Phase 1: Requirements Specification • Phase 2: Implementation of a functional prototype • Phase 3: Implementation of complete pilot system and execution of the Factory Acceptance Tests • Phase 4: Functional Tests • Phase 5: Interconnection of the European Hull Database pilot system with vessel certification authorities and RIS Providers • Phase 6: Execution of the stability tests of the pilot system (finalized in April 2010) • Phase 7: Pilot operation of the system (starting as of 2nd quarter of 2010 for 2 years), in which the contractor hosts the database, provides 1st and 2nd level (telephone) support during office hours and software maintenance • Phase 8: Full-scale implementation of the system (after PLATINA) 16
System Implementation (2/2) Technical implementation finalized in April 2010 17
Ensuring Data Protection Step 1: Exchange of letters for data exchange of authorities issuing ENIs • Austria • Belgium • Bulgaria • Czech Republic • Germany • France • the Netherlands • Romania • Slovakia Step 2: Conclusion of a service agreement for full scale data exchange (including use for RIS services) 18
Next Steps • Sequential data upload • upload of ENIs issued after 30.4.2007 • Upload of additional data and certificates • Integration of additional countries, functional amendments of the EHDB • Conclusion of service agreement for hull data exchange • Definition of operator of the EHDB for the time after PLATINA 25
Why authorities support the European Hull Database • Participation in the pilot phase is an opportunity to collect experiences without operational risks and disturbances • Participation in the pilot phase allows for active involvement in the system development • Participation in the pilot phase allows for gradual and smooth implementation in the respective countries 26
Agenda Overview of PLATINA Overview of European Hull Database Reflection group on inland navigation 27