1 / 1

9 Year History: Physics Modeling Applied to Design, V&V, Training & Decision Aids r1

9 Year History: Physics Modeling Applied to Design, V&V, Training & Decision Aids r1. Executive Summary. 2003. 2004. 2005. 2006. 2007. 1999. 2000. 2001. 2002. CNET : Task Force Excel http://www.uscg.mil/TCYORKTOWN/PTC/downloads/TFE.ppt.

kiara
Download Presentation

9 Year History: Physics Modeling Applied to Design, V&V, Training & Decision Aids r1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 9 Year History: Physics Modeling Applied to Design, V&V, Training & Decision Aids r1 Executive Summary 2003 2004 2005 2006 2007 1999 2000 2001 2002 CNET : Task Force Excel http://www.uscg.mil/TCYORKTOWN/PTC/downloads/TFE.ppt 2005 – 2007 ANZAC Frigate Total Ship HME&DC Model Navy Training Requirements VADM Lee Gunn Report Revolution in Training w/ To build careers / use Multi-Level Metrics … CNO ADM Clark ordered Executive Review Navy Training (ERNT) CNET: 5 Vector Model / Career Training & Education from Ship Acquisition thru Ship Lifecycle NAVSESS $$ AC Unit Model for ICAS Virtual “Hot Plant” and OBT Premise: Use ship design tools to support ship design / program managers during all phases of design, trials and tests, permitting IV&V monitoring the designs and HSI objectives in progress, linked to corresponding CAD drawings. Physics – math models (basis of design), now “lost”, are captured for reuse for: Distance Support, Performance Monitoring, Readiness Assessment, Operational Decision Aids for DC and Engineering, and future ShipAlt planning. Also support advanced dynamic interactive training ashore and afloat, as well as to provide the underlying computations to teach students how and why systems work – prepare them for critical thinking, college work, etc. NAVSESS $$ HPAC Model for ICAS Virtual “Hot Plant” and OBT PMS 430 BFTT Observes SIMSMART™ Physics Ship Model at SNAME 430 Has BFTT CS SIM-STIM; Needs HM&E & DC SIM-STIM BTSWG Mtgs New NAVSEA VADM Balisle Re-org NAVSEA IWS-1E Rick Bragg. All new contracts. Staff change over. 1st Demo/Model delivered Notional CG I/ITSEC 2001 International BFTT Demo Tactical & Eng, DC via WAN U.S. U.K.-Aus.-Netherlands. SBIR Ph 2 Ends Model of notional “CG” DSR SBIR Contract Mod to add Simsmart HM&E-DC model SBIR Phase 2 BFTT CS / HM&E and DC Model demonstrated OAK added to SBIR DSR / Simsmart / OAK contracts end IWS-1E BFTT First Real Time cascading casualties for damage and HM&E / repair tied to BFTT CS, using EOSS / EOCC / CSOSS I/ITSEC 2000, see DCAMS at BFTT booth, Recommend join SBIR Mar 2002:Directed Demo for VADM LaFleur & Staff @ SD TSTC ICD Drafted … Effort stopped with NAVSEA Reorg. CNSF VADM Tim LaFleur observes BFTT / Simsmart Demo @ SNA 2002 CoC CNSF RADM Terry Etnyre SNA 2002 Had tasked Staff in 2000 to Report status / requirements for CNSF training See CNSF PPT Jan 2002 2003 ASNE Tech Paper: “Achieve HSI through Design” 2004 I/TSEC Tech Paper “A Total Ship – Crew Model to Achieve HSI” Ship Models for Training from Ship Design Validation Tools @ SBIR 2002 CNSF: Can you provide CD for “A” School Sailors per ERNT? Yes. Draft DOP and ROI provided for CNSF HM&E dynamic design validation tools acquired by BIW & Ingalls for Modeling DD21 (DDX);by Avondale for PD17; by Ingalls for CG47 Mod; Gibbs & Cox, JJMA and NAVSEA etc. LHD-8 Modeling for SEA-05D . CSC NAVSEA National Shipbuilding Research Program (NSRP), Increase US - international Competitive Capability with an Advanced Shipbuilding Enterprise (ASE) & Processes NSRP $$ to Simsmart to integrate with CATIA CAD for Dynamic Validation NSRP $$ to Simsmart to integrate with AutoCAD (Ship Constructor) for Dynamic Validation NSRP $$ to Simsmart to integrate with Intergraph CAD for Dynamic Validation 3/05 GAO Report 05-183: findings include … ship design incomplete before production causing cost over run & deficient systems. Also see INSURV MSG: PREINSURV Norfolk VA 181811Z July 05 LPD-17 Incomplete … LPD 17 is Navy’s First attempt at full digital design incorporating CAD and Physics Dynamic Validation, Selects SIMSMART™ via competition LPD17: 11 Vital Fluid systems validated with models for NAVSEA. HVAC & Electrical not validated (SB Space Undersized) • Ingalls FSO CG 47 Mod dynamic design Validation / Model: • Electrical Plant 13K Objects • Firemain 4K Objects • Chill Water 4K Objects LCS Ships (did not use dynamic design validation = no model) Ingalls sells idea to DD21 Alliance & Navy DD21 Program CATIA CAD + Simsmart Physics for Design Validation OAK e-DCAMS OAK DCTMS DCAMS NAVSEA O5L4 Program Objective Memorandum (POM) 5 years System of Record: Budget line DDG1000 Simsmart Physics to CATIA V5 Revs 15, 16, 17 … continues DD21 Dies DD(X) obtains CATIA- SIMSMART™ integration in Dec 04 for Dynamic Validation of Fluid and HVAC (Electrical TBD) Raytheon Phase 4 of DD(X) DD(X) begins NGSS wins again, as Design Agent BIW/ Ingalls Together = DD21 Alliance Both select Simsmart via Competition Katrina Flood Damage NGSS wins DDX Replace Dongle license plugs for SIMSMART™ DDX Dynamic Validation and Integration to Continue DDX Starts Engineers at Ingalls scope CAD & dynamic Design Validation using physics models www.ITEinc.US Protest

More Related