An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I-69 Team 3

  2. Introduction • History of project • Proposed Route • Challenges

  3. Introduction • Role of Team 3 • Scope of 498 design • Pavement & Drainage for 2 mile section • One bridge over water • One Underpass Design [MSE walls] • Segment • Jacko really wants to see some fancy zooming in animations here. I’m thinking we start in outer space.

  4. Outline • Order of items to be discussed • Alignment • Pavement Materials • Drainage Considerations • Structure Design • Environmental Impact • Cost Analysis

  5. Alignment • Proposed PB alignment. • Start/End points • Why this alignment is the best[?] alternative • Right of Way requirements • Relocation requirements • Wetlands Avoidance • Other things

  6. Pavement Design: Introduction • Concrete vs. Asphalt • Geotechnical Considerations • Design Controls • Materials Quantity Estimates • Estimated Costs for Materials, Construction

  7. Pavement Design: Design Controls • Design Life • Roadway Characteristics • Design Load • ESALs, AADT • Where does this information come from?

  8. Pavement Design: Geotechnical Considerations • Soil Boring Data Description • Soil Types Present • Pictures? • Capacity of soils • How did we find this info • Impact on design • Materials, Cost, Construction

  9. Pavement Design: Material Selection • HMA vs. PCC • Or WMA… • Cost Analysis • Initial Cost • Rehab Cost • Where did our # come from • What this means • Impact/Importance of cost • How much money is available • Cost vs safety

  10. Pavement Design: Material Quantities • Dimensions of paved area • Lanes, shoulders • Thickness of subbase, base, surface • Waste

  11. Pavement Design: Cost • Materials Costs • Construction Costs • Permits • Labor • Earthwork • Machinery • Quality Control

  12. Drainage • Pavement drainage design • Median Drainage Design • Culvert Design • Design Criteria • Considerations • Estimated Quantities • Estimated cost for Materials, Construction

  13. Structure • Over Water: • Design Load • Material to be Used • Alternatives? • Estimated Materials Quantities • Estimated Cost of Materials, Construction

  14. Structure • Underpass (MSE Walls) • Why MSE walls? • Design Criteria • Material Quantities • Cost Estimates • Materials, Construction

  15. Environmental Impacts • Materials used in construction • Hazardous? Sustainable? • Disturbance due to construction • Hazardous Wastes • Existing Communities/Residents • Disturbance due to operation • Indiana Bat • Indiana Snakes • Other wildlife • Floodplains • Wetlands • Noise Pollution • Air Pollution • Changes in waterway flow/path

  16. Cost Analysis • Total cost estimates • Construction Costs • Materials Costs • Comparison of alternative Materials