I-69. Team 3. Introduction. History of project Proposed Route Challenges. Introduction. Role of Team 3 Scope of 498 design Pavement & Drainage for 2 mile section One bridge over water One Underpass Design [MSE walls] Segment
E N D
I-69 Team 3
Introduction • History of project • Proposed Route • Challenges
Introduction • Role of Team 3 • Scope of 498 design • Pavement & Drainage for 2 mile section • One bridge over water • One Underpass Design [MSE walls] • Segment • Jacko really wants to see some fancy zooming in animations here. I’m thinking we start in outer space.
Outline • Order of items to be discussed • Alignment • Pavement Materials • Drainage Considerations • Structure Design • Environmental Impact • Cost Analysis
Alignment • Proposed PB alignment. • Start/End points • Why this alignment is the best[?] alternative • Right of Way requirements • Relocation requirements • Wetlands Avoidance • Other things
Pavement Design: Introduction • Concrete vs. Asphalt • Geotechnical Considerations • Design Controls • Materials Quantity Estimates • Estimated Costs for Materials, Construction
Pavement Design: Design Controls • Design Life • Roadway Characteristics • Design Load • ESALs, AADT • Where does this information come from?
Pavement Design: Geotechnical Considerations • Soil Boring Data Description • Soil Types Present • Pictures? • Capacity of soils • How did we find this info • Impact on design • Materials, Cost, Construction
Pavement Design: Material Selection • HMA vs. PCC • Or WMA… • Cost Analysis • Initial Cost • Rehab Cost • Where did our # come from • What this means • Impact/Importance of cost • How much money is available • Cost vs safety
Pavement Design: Material Quantities • Dimensions of paved area • Lanes, shoulders • Thickness of subbase, base, surface • Waste
Pavement Design: Cost • Materials Costs • Construction Costs • Permits • Labor • Earthwork • Machinery • Quality Control
Drainage • Pavement drainage design • Median Drainage Design • Culvert Design • Design Criteria • Considerations • Estimated Quantities • Estimated cost for Materials, Construction
Structure • Over Water: • Design Load • Material to be Used • Alternatives? • Estimated Materials Quantities • Estimated Cost of Materials, Construction
Structure • Underpass (MSE Walls) • Why MSE walls? • Design Criteria • Material Quantities • Cost Estimates • Materials, Construction
Environmental Impacts • Materials used in construction • Hazardous? Sustainable? • Disturbance due to construction • Hazardous Wastes • Existing Communities/Residents • Disturbance due to operation • Indiana Bat • Indiana Snakes • Other wildlife • Floodplains • Wetlands • Noise Pollution • Air Pollution • Changes in waterway flow/path
Cost Analysis • Total cost estimates • Construction Costs • Materials Costs • Comparison of alternative Materials