1 / 14

Out-Of-Compliance UES Measure Recommendations Part 1 – November Measures

Out-Of-Compliance UES Measure Recommendations Part 1 – November Measures. Regional Technical Forum November 19, 2013. What do our Guidelines say?. Savings Guidelines: 2.6.1.4 . Out-Of-Compliance

kiefer
Download Presentation

Out-Of-Compliance UES Measure Recommendations Part 1 – November Measures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Out-Of-Compliance UES Measure RecommendationsPart 1 – November Measures Regional Technical Forum November 19, 2013

  2. What do our Guidelines say? • Savings Guidelines: 2.6.1.4. Out-Of-Compliance • The UES estimates for these measures will continue to be RTF-Approved if a plan for bringing the measure into compliance is approved by the RTF within one year following the RTF determination that the measure is out-of-compliance. If no plan is approved within one year, the RTF will decide whether the measure should be de-activated.

  3. OOC Measures Currently Sunsetting • Commercial • Appliances - Dishwashers • Appliances - Ice Makers • Residential • Heating/Cooling - PTCS Commissioning, Controls, & Sizing MH • DHW - Drain Waste Heat Recovery • Grocery • Grocery - ECMs for Walk-ins • Grocery - Lighting - CFLs • Grocery - Lighting - T8s • Agriculture • Variable Frequency Drives - Dairy • Variable Frequency Drives - Potato/Onion Shed

  4. What has been done regionally? • RTF Staff will attempt to update measures where sufficient data exists • No primary data collection, but will help analyze • Surveyed region in March to prioritize out-of-compliance measures (results here) • Checked with programs for evaluations underway • Surveyed region in October specifically related to measures sunsetting in 2013 • Asked if data was available or if ok to deactivate

  5. Survey Results Overview Note: These results are for measures sunsetting in November only. Total respondents n=19 organizations.

  6. Measure Overview & Recommendations Note: For regional survey, n=65, 42% of which were program administrators.

  7. Measure Overview & Recommendations Note: For regional survey, n=65, 42% of which were program administrators.

  8. Decision “I _________ move to accept staff’s proposed plan to bring the following UES measures into compliance and to extend the sunset dates as shown below:”

  9. Out-Of-Compliance UES Measure RecommendationsPart 2 – December & January Measures Regional Technical Forum November 19, 2013

  10. Other Measures Due to Sunset • Almost all OOC measures due to sunset in December & January are Grocery • Commercial refrigerator decommissioning is the exception • Obtained remaining savings potential estimates from PECI for grocery UES measures • Also referenced the 2013Cadmus Grocersmart evaluation report for BPA territory • Looked at Grocersmart data for grocery stores; omitted convenience stores

  11. Other Measures Due to Sunset Note: These results are for measures sunsetting in December & January only. Total respondents n=19 organizations. Open Case LED and RTU VFDs were not included in the survey so no results are listed. PECI is interested in both of these measures going forward.

  12. Measure Remaining Potential *Approved as Provisional measure. No further research conducted since measure was approved in August, 2011.

  13. Measure Overview & Recommendations *Approved as Provisional measure. No further research conducted since measure was approved in August, 2011.

  14. Decision “I _________ move to accept staff’s proposed plan to bring the following UES measures into compliance and to extend the sunset dates as shown below:”

More Related