FAIR – Facility for Antiproton and Ion Research. Observers. Status of FAIR FAIR 2 nd Instit. Meeting, January 15/16 th , 2008 H.H.Gutbrod Leader FAIR Joint Core Team.
E N D
FAIR – Facility for Antiproton and Ion Research Observers Status of FAIR FAIR 2nd Instit. Meeting, January 15/16th, 2008 H.H.Gutbrod Leader FAIR Joint Core Team Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK
Official start of the FAIR Project on November 7th, 2007 at Darmstadt .................................... ...........with about 1400 participants
We have a project under way! • Who decided to participate and has not yet started to work should start now! • Do not wait to get design drawings from somewhere! • You are the designer, producer, installer,commissioner! • JCT -later FAIR GmbH - is ‘just’ project management
Status of Declarations from FAIR partner countries Red= written declaration, black= no written declaration yet, green=high chance for add. contribution Austria 0.5% China 1.=% minimum Finland 0.5% minimum France 1% minimum Greece ?? India 3% minimum Italy 40 Mio € minimum (3.36%) Poland 30 Mio € minimum (2.5%) Romania 1% Russia 5%, has now initiated steps for 10% Slovenia 1% Spain 2% minimum Sweden 10 Mio € (0.84%) UK 15 Mio € (1.25%), has proposed additional 45 Mio € Sum 22,95% + 5% Russia + 3.79% UK = 31.74% of FAIR _Project Further candidates: Slovak Republic, The Netherlands, Hungary, Georgia,
21 Expression of Interests received so far ! EoIs still missing from
WP 2.3 HEBT
WP 2.4 Super FRS
WP 2.5 Collector Ring CR
WP 2.6 NESR
WP 2.7 Proton Linac
WP 2.8 SIS 100
WP 2.9 P-bar Target and Separator
WP 2.12 SIS 300
WP 2.13 Electron Ring at NESR
Status of Response to Call for Expression of Interest (EoI) Call for Expression of Interest to participate in the construction of FAIR is a big success: The FAIR accelerator complex will be built by the leading experts of the FAIR countries! Something money cannot buy! Missing EoIs from: France, Greece, Slowenia, UK • Missing MoU countries most urgently invited to follow up the call, since we need to advance at the ISC meeting on February 18th, upon recommendations of IKAB on January 8th • Certain overlap of interests require creation of accelerator consortia, e.g. p-Linac, NESR, Super-FRS etc.. • Next steps .....
January 15th, 2008 • 09:00 – 09:15 • Welcome and short presentation of the host laboratory Nikolai Tyurin • 09:15 – 09:30 • Rosatom and FAIR Russia Oleg Patarakin • 09:30 – 10:00 • Accelerator complex of IHEP-Protvino Sergei Ivanov • 10:00 – 10:30 • FAIR Russia Research Centre Boris Sharkov • 10:30-11:00 COFFEE Break • 11:00 – 11:20 • Status of FAIR Expression of Interests Hans Gutbrod • 11:20– 11:40 • Report from the IKAB meeting Horst Wenninger • 11:40 – 12:10 • Status report on FAIR accelerators, general planning Dieter Krämer • 12:20 – 12:50 • Design and Engineering Issues; Standardization and Synergies Dieter Krämer • LUNCH break
14:20 -17:10 • Start of discussions of work packages in detail, milestones, readiness etc., short presentations of representatives of the interested institutions (countries). • 14:20 – 14:50 2.4, Super Fragmentseparator • EoIs No. 1, 2, 11a, 13e, 13h, 13i, 14a, 15, 21 • VECC (IN), Profex (Ro), CIEMAT (ES), GSI, IMP (CN), Wroclaw UT (PL), • Soltan Inst. (PL), (France) for the machine coordination: Markus Steck • 14:50 – 15:10 2.5 CR (Collector Ring) • EoIs No.5a, 8b, 13b, 13c, 13h, 13i, 14b, 15, 21 • Budker INP (RU), ITEP (RU), GSI, IMP (CN), Wroclaw UT (PL), • Soltan Inst. (PL), for the machine coordination: Markus Steck • 15:10 – 15:30 2.6 NESR (New Experimental Storage Ring) • EoIs No. 5b, 11b ,13b ,13i, 21 • Budker INP (RU), CIEMAT (ES), GSI, Soltan Inst. (PL) • for the machine coordination: Markus Steck • 15:30 – 15:50 2.10 RESR (Recuperated Experimental Storage Ring) • EoIs No. 8b, 11c, 13b, 13c, 13h, 13i, 21 • ITEP (RU), CIEMAT (ES), GSI, Soltan Inst. (PL) • for the machine coordination: Markus Steck • COFFEE
16:00 – 16:20 2.3 HEBT (High-Energy Beam Transfer Lines) EoIs No. 13h, 13i, 18, 20, 21 GSI, ICSI (RO), Efremov (RU), Soltan Inst. (PL) for the machine coordination: Peter Spiller 16:20 – 16:50 2.8 SIS 100 (Heavy-Ion Synchrotron 100 Tm) EoIs No. 4, 7, 8a, 9, 12, 13b, 13f, 13g, 13h, 13i, 15, 18, 21 Finland, Cracow UT (PL), ITEP (RU), JINR, VNIINM (RU), GSI, Wroclaw UT (PL), ICSI (RO), Soltan Inst. (PL) for the machine coordination: Peter Spiller 16:50 – 17:15 2.12 SIS 300 (Heavy-Ion Synchrotron, 300 Tm) EoIs No. 3, 4, 7, 8a, 12, 19, 21 IHEP (RU), Finland, Cracow UT (PL), ITEP (RU), VNIINM (RU), Italy, Soltan Inst. (PL) for the machine coordination: Peter Spiller 17.15 – 19.00 Excursion to the IHEP accelerator complex and the workshops. 19.30 Dinner at the Scientists’ club
January 16th, 2008 • 09:00 – 10:40 • Continuation of discussions of work packages in detail, milestones, readiness etc. • 9:00 – 9:25 2.7 Proton Linear Accelerator • EoIs No. 8c, 13a, 13b, 16 • ITEP (RU), GSI, Dept of Science and Technology (IN), (France) • for the machine coordination: Hartmut Eickhoff • 9:25 – 9:55 2.9 Antiproton-Target, and 2.11, HESR (High-Energy Storage Ring) • for 2.9: EoIs No. 13h, 13i, 21 • for 2.11: EoIs No. 8b, 10, 17, 21 • ITEP (RU), Jülich (DE), Sweden, Soltan Inst. (PL) • for the machine coordination: Dieter Krämer • 9:55 – 10:15 2.13 ER (Electron Ring) • EoIs No. 5c, 21 • Budker INP (RU), Soltan Inst. (PL) • for the machine coordination: Markus Steck • 10:15 – 10:50 Items not yet covered • Discussion leader: Hans Gutbrod • 10:50 – 11:10 COFFEE break • 11:10 – 13:00 • Summary and focus on critical points, multiple interest for one work package, specs, way of collaborations, perhaps formation of collaborations, Technical Design Reports, next steps... • Discussion leader: Hans Gutbrod • 13:00 LUNCH • 14.30 End of the Meeting
Next Steps: • Detailing of EoIs in upcoming meeting and weeks, especially identification of persons in charge, better specification of items, collaborations.......active collaboration with international FAIR partners strengthening the FAIR project and the FAIR JCT by detaching people to Darmstadt. • Preparation of Technical Design Reports • Setting up of Machine Advisory Committee • Drafting of contracts where possible • --------------------------------- • ISC meeting 19th of February 2008 • Final Act by FAIR countries’ governments • Creation of FAIR GmbH early Summer of 2008 • Staffing of managing director positions • But above all that: • Continue or get started with the FAIR accelerator projects you want to work on!