Work Breakdown Structure (WBS) Extended Table of contents. Introduction The project triangle. Product (result, features, quality). Resources. Time. Introduction The project triangle. Product (result, features, quality) What: . Resources Who. Time When.
E N D
Work Breakdown Structure (WBS) Extended Table of contents
IntroductionThe project triangle Product (result, features, quality) Resources Time
IntroductionThe project triangle Product (result, features, quality)What: Resources Who Time When
The project triangleThe relation between product, time and resources Product Change in one part – will have consequences for other parts Time Resources
Works Breakdown Structure is: • A method for organizing tasks for a project • Focuses on tasks and what needs to be done in a hierarchical way – top down (headlines not importance) • Most of the time - says nothing about time (sequence and time needed) • From distance the elephant doesn’t look that big – but when it comes closer • But bite the elephant into smaller pieces
WBSWhy breaking the project into tasks? • Clear plan of the work-sequence towards completion of promised deliverables • Easier to manage -> plan, execute and control • Easier to decide what kind of skills/resources are needed + estimate resource (time, manpower and machinery) • Easier to communicate and understand Project planning and control
WBS: Ground rules for WBS • Define the work as independent tasks that can be sequenced, assigned, scheduled and monitored • Define the tasks at a level of detail appropriate for the length and complexity of the project • Think parallel tasks, but be aware of dependencies, joint decision and completion points • Present the hierarchy of tasks in a easy understood format • Verify that the tasks cover the attainment of project goals and objectives Project planning and control
IntroductionFrom structure into a plan • From distance the elephant doesn’t look that big – but when it comes closer !!! - ??? • ... bite the elephant into smaller pieces Project planning and control
Work Breakdown Structure I • Stepwise or gradually planning process. • Structuring according to: • Physical/geographical location • Type of work • Functions • Systems • Organisational belonging
Work Breakdown Structure II Use e.g. your function tree or mind –map to split your project tasks into even smaller tasks. Determine in which order you will solve the different tasks.
ExtendedTable of Contents • An Extended Table of contents is an Extended Table of contents • Table of contents known from reports and word! • ETOC is used for helping you discuss and structure your project – before you start writing on your project (probably not now) • Consist typically of: • Content • Arguments • Literature/method based upon • Number of pages / extent • Responsible
To the next time • Hand in preliminary project description – October 1rst (to your supervisor and upload to fronter) – • ALL 7 sections must be included (Planning tools next time) • Approximately 10 pages • Everyone from the group must “deliver” and participate in the work