1 / 10

Plans for Software

Plans for Software. 4th Concept Collaboration Meeting FNAL 19-20 October 2006. General Issues. Two time frames to consider: Short haul Long haul Collaborative Effort Funding Issues. The Very Short Haul. Valencia Meeting (two weeks) Complete tracking in VXD Barrel + TPC

Download Presentation

Plans for Software

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plans for Software 4th Concept Collaboration Meeting FNAL 19-20 October 2006

  2. General Issues • Two time frames to consider: • Short haul • Long haul • Collaborative Effort • Funding Issues

  3. The Very Short Haul • Valencia Meeting (two weeks) • Complete tracking in VXD Barrel + TPC • No digitization for VXD nor TPC • No muon reconstruction • Physics studies to present: • e+e- -> Zo -> uds (simple jet-finder) • e+e- -> HoZo -> Xm+m- (tracking resolution) • e+e- -> tt -> 6 jets (tracking performance) • Single particles: e+,m,p,p,Kshort, single jets • Beam background studies (in cooperation with SiD)

  4. The Semi- Short Haul • DCR (Dec. 10th or Jan. 2007 ?) • Complete tracking in VXD Endcaps • Digitization for VXD (should pick up one of the technology) • Some muon reconstruction • Physics studies to present: • More sofisticated jet-finder (Durham, Kt) • e+e- -> HoZo -> 2 jets, 4 jets • Hopefully c,b separation in jets

  5. The Long Haul • LCIO conformance • Collaboration with Fermilab • 4 peoples now for 1 month • D. Barbareschi for 5 months next year • More going on next year • Many thanks to Marcel for making it happen

  6. LCIO vs MONARC MC Generation  Energy Deposits in Detector MC Generation  Energy Deposits in Detector SDigitization  Detector response from single particle Digitization  Tracker Hits Digitization Detector response combined Pattern Recognition Recpoints Track Finding  Tracks Track Finding  Tracks Track Fitting  Track Parameters Track Fitting  Track Parameters

  7. Established Benchmark Processes

  8. e+e- -> W+W- -> Xqq

  9. Present Analyses • e+e- -> ZoHo -> qqbb Mjj only (no stress on VXD) • e+e- -> W+W- -> qqqq Mjj only (bkg only) We Need • e+e- -> ZoHo -> qqqq d(BR) for individual flavor • t reconstruction

  10. About muons • Muon resolution in MUD very good (Bangalore) • However, need to test muon reconstruction in jets (C. Milstene)

More Related