Faculty of Applied Engineering and Urban Planning Civil Engineering Department ECCS5209. Project Planning & Control. Eng: Eyad Haddad. Q2 / (2008 – 2009) Schedule the following project given the data shown below. Calculate ES, EF, LS, LF, TF. Also, mark the critical path (s). D 7. FF+5. B
E N D
Faculty of Applied Engineering and Urban PlanningCivil Engineering DepartmentECCS5209 Project Planning & Control Eng: Eyad Haddad
Q2 / (2008 – 2009)Schedule the following project given the data shown below. Calculate ES, EF, LS, LF, TF. Also, mark the critical path (s) D 7 FF+5 B 4 SS+10 FS+2 FF+3 Es=0 A 2 E 4 G 2 SS+5 SS TF/FF FF+4 ES EF Act Dur C 6 FS+6 F 3 LF LS TF/FF TFi = LFi - EFi
Q3 / (2008 – 2009)Schedule the following project given the data shown below. Calculate ES, EF, LS, LF, TF. Constraints must be observed: a) Project starts on day 1. b) Days 3, 10, 17, 24 are non-working days. D 7 FF+5 B 4 SS+7 FS+2 FF+3 A 2 E 4 G 2 SS+5 SS TF/FF FF+4 ES EF Act Dur C 6 FS+6 F 3 TF/FF TFi = LFi - EFi LF LS
Q2 / (2001 – 2002)Schedule the following sub projects given the data shown below. Calculate ES, EF, LS, LF, TF. Constraints must be observed: A) F must finish with P. B) W must finish with G. B 3 E 11 SS+5 Es=0 A 5 C 8 F 6 G 3 D 8 Sup project A TF/FF L 3 O 7 ES EF FF+3 Act Dur Es=10 K 2 M 4 P 6 W 3 LF LS N 4 Sup project B
Q4 / (2001 – 2002)Perform the forward pass and backward pass calculations for the given network shown in Figure below. Determine the critical path, project duration, and for each activity determine the ES, EF, LS, LF and FF. Also show the critical path (s). The following constraints should be considered:Activity H must finish on day 20; andActivity K has to start no later than day 17. A 5 E 5 G 4 K 9 FS FF+2 FS FS FS FF FS FF+2 Es=0 St 3 B 4 D 3 F 9 J 6 Fn. 0 FS FS SS FS FS SS FS+1 FS FF C 6 H 8 FS TF/FF ES EF Act Dur LF LS
Q1 / (2001 – 2002) A) Schedule the following project given the data shown below. Calculate ES, EF, LS, LF, TF. Also, mark the critical path (s). B) suppose that all the work activities have been scheduled to start as early as possible and that the activities have been on schedule up to the end of day 11. there is a strike on day 12 causing a delay of 4 days. Calculate ES, EF, LS, LF, TF. Also, mark the critical path (s).