HAPTER 19. AIS Development Strategies. INTRODUCTION. Questions to be addressed in this chapter include: How do organizations buy software, hardware, and vendor services? How do information systems departments develop custom software?

kimo
Download Presentation

HAPTER 19

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HAPTER 19 AIS Development Strategies

  2. INTRODUCTION • Questions to be addressed in this chapter include: • How do organizations buy software, hardware, and vendor services? • How do information systems departments develop custom software? • How do end users develop, use and control computer-based information systems? • Why do organizations outsource their information systems, and what are the benefits and risks of doing so? • How are prototypes used to develop an AIS, and what are the advantages and disadvantages? • What is computer-aided software engineering, and how is it used in systems development?

  3. INTRODUCTION • Companies can experience a number of difficulties in developing an AIS, including: • Projects are backlogged for years because of the high demand for resources. • The newly designed system doesn’t meet user needs. • The process takes so long that by the time it’s complete, it’s obsolete. • Users can’t adequately specify their needs. • Changes to the AIS are often difficult to make after requirements have been written into the specifications.

  4. INTRODUCTION • We’ll be discussing how to obtain a new information system by: • Purchasing prewritten software; • Developing software in-house; or • Outsourcing. • We’ll also discuss how to hasten or improve the development process through: • Business process reengineering • Prototyping • Computer-aided software engineering (CASE) tools

  5. INTRODUCTION • We’ll be discussing how to obtain a new information system by: • Purchasing prewritten software • Developing software in-house; or • Outsourcing. • We’ll also discuss how to hasten or improve the development process through: • Business process reengineering • Prototyping • Computer-aided software engineering (CASE) tools

  6. PURCHASING PREWRITTEN SOFTWARE • In the early days of computers, companies were rarely able to buy software to meet their needs. • But commercially available packages are now outpacing custom-developed software as old systems are replaced.

  7. PURCHASING PREWRITTEN SOFTWARE • Canned software is sold on the open market to a broad range of users with similar requirements. • Some companies sell hardware and software together as a package. • These systems are called turnkeysystems. • Many are written by vendors who specialize in a particular industry.

  8. PURCHASING PREWRITTEN SOFTWARE • A major problem with canned software: • It often does not meet all of a company’s information needs. • Can be overcome by modifying the canned software. • Usually best done by the vendor. • Unauthorized modifications may render the program unreliable and unstable.

  9. PURCHASING PREWRITTEN SOFTWARE • Companies can also acquire software through application service providers (ASPs). • ASPs host Web-based software and deliver it to clients over the Internet. • Companies don’t have to buy, install, or maintain canned software; they simply “rent” it. • If you used an online version of a package like Turbo-Tax to prepare your taxes, that’s a consumer version of renting software over the Internet.

  10. PURCHASING PREWRITTEN SOFTWARE • Advantages of ASPs: • Reduction of software costs and administrative overhead. • Automated software upgrades. • Scalability as the business grows. • Global access to information. • Access to skilled IT personnel. • Ability to focus on core financial competencies rather than IT.

  11. PURCHASING PREWRITTEN SOFTWARE • Purchasing software and the SDLC: • Companies that buy rather than develop software still follow the SDLC process, including: • Systems analysis • They conduct an initial investigation, systems survey, and feasibility study, as well as determining AIS requirements.

  12. PURCHASING PREWRITTEN SOFTWARE • Purchasing software and the SDLC: • Companies that buy rather than develop software still follow the SDLC process, including: • Systems analysis • Conceptual design • An important aspect is determining whether software that meets AIS requirements is already available. • If so, a make-or-buy decision must be made.

  13. PURCHASING PREWRITTEN SOFTWARE • Purchasing software and the SDLC: • Companies that buy rather than develop software still follow the SDLC process, including: • Systems analysis • Conceptual design • Physical design • If software is purchased, program design and coding can be omitted. • But software modifications may be needed. • Companies also may design inputs, outputs, files, and control procedures.

  14. PURCHASING PREWRITTEN SOFTWARE • These activities must still take place, including: • Selecting and training personnel • Installing and testing hardware and software • Documenting procedures • Converting from old to new AIS • However, the software modules do not have to be developed and tested. • And the computer programs do not need to be documented. • Purchasing software and the SDLC: • Companies that buy rather than develop software still follow the SDLC process, including: • Systems analysis • Conceptual design • Physical design • Implementation and conversion

  15. PURCHASING PREWRITTEN SOFTWARE • Purchasing software and the SDLC: • Companies that buy rather than develop software still follow the SDLC process, including: • Systems analysis • Conceptual design • Physical design • Implementation and conversion • Operation and maintenance • The AIS is operated like any other software. • The vendor usually maintains the software.

  16. PURCHASING PREWRITTEN SOFTWARE • Selecting a vendor • Deciding whether to make or buy software can be made independently of the decision to acquire hardware, service, maintenance, and other AIS resources. • And the preceding resources can be bought independently of the software. • But hardware and vendor decisions may depend on the software decisions.

  17. PURCHASING PREWRITTEN SOFTWARE • Vendors can be found by: • Looking in phone book • Obtaining referrals • Scanning computer or trade magazines • Attending conferences • Using search organizations • Beware of fly-by-night companies that can leave your organization high and dry.

  18. PURCHASING PREWRITTEN SOFTWARE • Acquiring hardware and software • Once AIS requirements have been defined, the organization can buy software and hardware. • Companies needing only a PC and some office software can usually complete their own research and make a selection.

  19. PURCHASING PREWRITTEN SOFTWARE • When buying large or complex systems, a request for proposal (RFP) should be prepared: • The RFP is an invitation to bidders to propose a system by a specific date. • Each proposal is evaluated. • Finalists are investigated in depth.

  20. PURCHASING PREWRITTEN SOFTWARE • The formal approach is important for several reasons: • Saves time • The same information is provided to all bidders.

  21. PURCHASING PREWRITTEN SOFTWARE • The formal approach is important for several reasons: • Saves time • Simplifies the decision-making process • The bidders all respond in the same format and based on the same information.

  22. PURCHASING PREWRITTEN SOFTWARE • The formal approach is important for several reasons: • Saves time • Simplifies the decision-making process • Reduces errors • Less likely to look over important factors in evaluating proposals.

  23. PURCHASING PREWRITTEN SOFTWARE • The formal approach is important for several reasons: • Saves time • Simplifies the decision-making process • Reduces errors • Avoids potential for disagreement • Both parties have the same expectations and information in writing.

  24. PURCHASING PREWRITTEN SOFTWARE • When an RFP is solicited based on exact hardware and software specifications: • Total costs are usually lower. • Less time is required for vendor preparation and company evaluation. • However, the vendor cannot recommend alternatives.

  25. PURCHASING PREWRITTEN SOFTWARE • A generalized RFP contains a problem definition and requests a system that meets specific performance objectives and requirements. • Leaves technical issues to the vendor. • However, makes it more difficult to evaluate proposals. • May produce more costly bids.

  26. PURCHASING PREWRITTEN SOFTWARE • Usually, the more information a company provides to the vendors, the better their chances of receiving a system that meets their requirements. • Detailed specifications should include: • Required applications • Inputs and outputs • Files and databases • Frequency and methods of file updating and inquiry • Unique characteristics or requirements • Be sure to distinguish between mandatory and desirable requirements.

  27. PURCHASING PREWRITTEN SOFTWARE • Evaluating proposals and selecting a system • Eliminate any proposals that: • Are missing important information. • Fail to meet minimum requirements. • Are ambiguous. • Those that pass the preliminary screening should be compared with the proposed AIS requirements to determine: • If they meet all mandatory requirements. • How many desirable requirements they meet. • Finalists can be invited to demo their system using company-supplied data.

  28. PURCHASING PREWRITTEN SOFTWARE • In reviewing the proposals, you need to evaluate: • Hardware • Software • Vendors

  29. PURCHASING PREWRITTEN SOFTWARE • In reviewing the proposals, you need to evaluate: • Hardware • Software • Vendors

  30. PURCHASING PREWRITTEN SOFTWARE • Criteria to evaluate hardware include: • Cost • Ability to run required software • Processing speed and capabilities • Secondary storage capability • Input and output speeds • Communication capabilities • Expandability • Recency of technology • Availability • Compatibility with existing hardware, software, and peripherals • Performance compared to competitors • Cost and availability of support and maintenance • Warrantees and guarantees • Financing arrangements • Ability to meet mandatory requirements

  31. PURCHASING PREWRITTEN SOFTWARE • In reviewing the proposals, you need to evaluate: • Hardware • Software • Vendors

  32. PURCHASING PREWRITTEN SOFTWARE • Criteria to evaluate software include: • Conformity with specifications • Need for modification • Performance (speed, accuracy, reliability) • Use by other companies • Satisfaction of other users • Documentation • Compatibility with existing software • User-friendliness • Ability to be demonstrated and test-driven • Warranties • Flexibility and maintainability • Capability for online inquiry of files and records • Vendor upgrades

  33. PURCHASING PREWRITTEN SOFTWARE • In reviewing the proposals, you need to evaluate: • Hardware • Software • Vendors

  34. PURCHASING PREWRITTEN SOFTWARE • Criteria to evaluate vendors include: • Size • Financial stability and security • Experience • Quality of support and warranties • Regularity of updates • Ability to provide financing • Willingness to sign contract • Willingness to provide references • Reputation for reliability and dependability • Hardware and software support and maintenance • Implementation and installation support • Quality and responsiveness of personnel • Willingness to provide training • Responsiveness and timeliness of support

  35. PURCHASING PREWRITTEN SOFTWARE • Approaches to comparing system performance: • Benchmark problem • Point scoring • Requirements costing

  36. PURCHASING PREWRITTEN SOFTWARE • Approaches to comparing system performance: • Benchmark problem • Point scoring • Requirements costing

  37. PURCHASING PREWRITTEN SOFTWARE • Benchmark problem • The new AIS performs a data processing task with input, processing, and output jobs typical of what would be required of the new system. • Processing times are calculated and compared. • The AIS with the lowest time is judged most efficient.

  38. PURCHASING PREWRITTEN SOFTWARE • Approaches to comparing system performance: • Benchmark problem • Point scoring • Requirements costing

  39. PURCHASING PREWRITTEN SOFTWARE • Point scoring: • A weight is assigned to each criterion used to evaluate the system, based on the relative importance of that criterion. • Each criterion is rated for each product. • Each rating is multiplied times the weight assigned to the criterion to develop a weighted score. • The weighted scores are added for each product.

  40. PURCHASING PREWRITTEN SOFTWARE • Example: • Zorba Co. is evaluating systems offered by three different vendors: Able Co., Baker Co., and Cook Co. • Zorba has determined three criteria that they will use to evaluate the different systems: cost, speed, and vendor reliability. • They have provided the following weights to each criteria, with vendor reliability being the most critical: • Vendor reliability—9 • Cost—6 • Speed—4

  41. PURCHASING PREWRITTEN SOFTWARE • Zorba examined the packages offered by the three vendors and rated them based on these three criteria. Ratings were from 1–5 with 5 being the highest score.

  42. PURCHASING PREWRITTEN SOFTWARE • The weighted scores are then computed by multiplying the rating given to each vendor on each criterion times the weight assigned to that criterion. X =

  43. PURCHASING PREWRITTEN SOFTWARE • The weighted scores for each company are summed: • Able = 60 points • Baker = 79 points • Cook = 68 points • Based on the preceding scores, the bid would probably be awarded to Baker Co.

  44. PURCHASING PREWRITTEN SOFTWARE • The preceding example is a simplification. In a real-life scenario, several factors would be different: • There would probably be many more criteria being considered. • Several people would be rating the criteria, and the final scores for each vendor would probably be a composite of those individual scores.

  45. PURCHASING PREWRITTEN SOFTWARE • Approaches to comparing system performance: • Benchmark problem • Point scoring • Requirements costing

  46. PURCHASING PREWRITTEN SOFTWARE • Requirements costing: • Estimates cost of purchasing or developing features that are not included in a particular AIS. • The total AIS cost is calculated by adding the acquisition cost to the purchasing and development costs. • Total cost = cost of system with all required features.

  47. PURCHASING PREWRITTEN SOFTWARE • To verify that the AIS that looks best on paper is actually the best in practice: • Test-drive the software. • Contact other users for references. • Evaluate vendor personnel. • Confirm details of the proposal.

  48. INTRODUCTION • We’ll be discussing how to obtain a new information system by: • Purchasing prewritten software • Developing software in-house • Outsourcing • We’ll also discuss how to hasten or improve the development process through: • Business process reengineering • Prototyping • Computer-aided software engineering (CASE) tools

  49. DEVELOPING SOFTWARE IN-HOUSE • Despite the availability of good canned software, many organizations develop their own because: • Their requirements are unique; or • Their size and complexity necessitates a custom package. • Developing custom software is difficult and error prone and consumes much time and resources. • The GAO reports that 31% of federal government IT projects are poorly planned or do not meet intended objectives.

  50. DEVELOPING SOFTWARE IN-HOUSE • The most difficult hurdles: • Lack of time. • Complexity of desired system. • Poor requirements and systems planning. • Inadequate communication and cooperation between departments and users. • Lack of qualified staff. • Poor senior executive support.