10 likes | 254 Views
Construction complete: Racks Network rack present PPS racks present DAQ racks present. Last two racks in shipment Air Conditioning Being installed Electrical Earth straps in All cable trays. Power in progress Network Installation started yesterday Floor
E N D
Construction complete: Racks Network rack present PPS racks present DAQ racks present. Last two racks in shipment Air Conditioning Being installed Electrical Earth straps in All cable trays. Power in progress Network Installation started yesterday Floor David Pyke sorting out the supplier Last estimate – “before Christmas” MLCR