370 likes | 641 Views
Nevada - Newmont’s Foundation. Trent Tempel, General Manager, Eastern Nevada Ali Soltani, General Manager, Western Nevada John McKinstry, General Manager, Midas. June 2002. Nevada Tour – June 2002. Nevada Newmont’s Foundation. 2000 2001 2002E Production 3.0 2.7 ~2.7
E N D
Nevada - Newmont’s Foundation Trent Tempel, General Manager, Eastern Nevada Ali Soltani, General Manager, Western Nevada John McKinstry, General Manager, Midas June 2002 Nevada Tour – June 2002
Nevada Newmont’s Foundation 200020012002E Production 3.0 2.7 ~2.7 Cash cost/oz $203 $222 $205-210 • 38 years of innovation • Produced 36 million ounces • 31 million ounces of reserves • 2,600 employees • Utilization of our asset base
Lone Tree Newmont Mines and Property Twin Creeks Midas NORTH 0 20 Deep Post Miles Deep Star Winnemucca Elko Carlin Trenton 80 Gold Quarry Phoenix Mule Canyon Checkerboard Property NEVADA 1996 Newmont Gold Company 1997 Santa Fe merger 2001 Battle Mountain Gold merger 2002 Normandy merger Barrick/Homestake ~1.8 million acres
A Long-Lived Core Asset • Unparalleled mining and processing flexibility • 9 open pit & 5 underground mines • 15 processing facilities • Pipeline of new projects to sustain production
West Nevada Lone Tree Twin Creeks Midas Oxide Refractory Oxide Refractory Oxide Midas Mill Juniper Mill Dump Leach LT Flotation LT Autoclave Dump Leach Sage Autoclave Dump Leach Mill 5 Mill 6 Roaster Dump Leach Deep Post Deep Star Oxide Refractory Refractory Oxide Refractory Refractory North Area South Area East Nevada Current Nevada Ore Flows
Generalized Processing Matrix Refractory % High Low Low ROM Dump Leach ($0.50-$0.65) Twin Creeks Lone Tree Complex South Area Twin Creeks North Area Low Dump Oxidation - Low-Ratio Leach ($1.50-$2.25) Twin Creeks Lone Tree South Area North Area Grade oz/t Ore Grade (oz/t) Crushed Dump Leach ($1.00-$1.40) South Area North Area Bio-Milling ($7.00-$9.00) Mill 5 - South Area Cost/ton Direct Cyanide Mill ($3.00-$16.00) Mill 5 – South Area Juniper – Twin Creeks Sage – Twin Creeks Midas – Western Nevada Cost $/t Flotation to Autoclave or Roaster ($7.50-$8.00) Lone Tree High Refractory Milling ($16.00-$20.00) Sage Autoclave – Twin Creeks Lone Tree Autoclave Mill 6 Roaster – South Area High
Gold Production (million ounces) 3.04 2.78 2.70 ~2.7 2.77 2.50 2.33 35% 67% 42% 68% 54% 65% 30% Cash Cost $232 $205 $209 $211 $203 $222 ~$205-210 Total Cost $302 $268 $273 $263 $260 $269 ~$260-270
Gold Production (million ounces) 3.04 2.78 2.77 2.70 ~2.7 2.50 2.33 Cash Cost $232 $205 $209 $211 $203 $222 ~$205-210 Total Cost $302 $268 $273 $263 $260 $269 ~$260-270
Significant Initiatives • Electrical Power • $65 million per year operating cost for Nevada (2nd to labor) • Tiger Teams integral to reducing consumption (~10%) • Workforce Optimization • Comprehensive review of organizational structure • Natural extension of 5-year attrition mode • Total employment down from 3,500 to 2,600 since 1997 • Midas Integration • Accelerated integration • Synergies of $8 million per annum • Other • 80 – 100 teams focused on wide spectrum of change initiatives • Key focus: safety, environmental, productivity, cost and cash flow
Capital Expenditures ($ million)
Production Pipeline First Production • Deep Post Underground 2001 • Gold Quarry Chukar Underground 2002E • Gold Quarry South Layback 2004E • Leeville Underground 2005E • Twin Creeks South Layback 2005E • Phoenix Sulfide 2008E • Emigrant Pit ????? • Gold Margin Underground ????? • Rain Saddle Underground ????? Capital rationing and flexible scheduling to sustain Nevada production.
Deep Post Underground Mine • Life-of-mine: 3.1 million ounces @ 0.76 opt • Commenced production: 2Q 2001 – ahead of schedule • Annualized mining rate: 1,500 tpd • Average annual production: 416,000 ounce (2003-2006) • Total cash costs: $159/ounce • Recent developments: • Increased production due to higher grade • Better ground conditions • Exploration upside
Chukar Underground • Chukar Underground • Currently in development • ~ $6 million capital cost • Au Reserves (300/ounce) • 278,000 tons at 0.49 ounces/ton containing 138,000 ounces • NRM: 115,000 tons at 0.46 opt • Production • 2 - 4 years at approximately 80,000 ounce • ~ $180 - $184/ounce cash cost • High grade feed for Carlin roaster
Gold Quarry South Layback • Au Reserves ($300/ounce) • 60.1 million tons 0.063 opt containing 3.8 million ounces • Production • 6 years totaling 2.6 million ounces • ~$230/ounce cash cost • First full year of production begins 2004 • Open pit mining • Capital Cost • $26 million • Recent Developments • Concurrent reclamation • Improved mine design with phased approach
Leeville Underground • Au Reserves ($300/ounce) • 6.5 million tons at 0.46 opt containing 3.0 million ounces • NRM: 1.6 million tons at 0.53 opt • Production • 7+ years at approximately 500,000 ounces per annum • ~$195/ounce cash cost • Production would begin in 2005 • High grade feed for the Carlin roaster • Capital Cost • $170 million • Recent Developments • Change in mining method • Change in mining sequence
Twin Creeks South Layback • Au Reserves ($300/ounce) • 29.3 million tons at 0.066 opt containing 1.9 million ounces • Non-reserve material: 5.9 million tons at 0.051 opt • Production • 7 years totaling 1.6 million ounces • ~$210/ounce cash cost • Production begins 2005 • Open pit mining • Feed Juniper Oxide Mill for 6 years • Capital Cost • $15 million - $20 million • Recent Developments • Ability to backfill • Positive model reconciliation
Phoenix Sulfide • Au Reserves ($300/ounce) • 174 million tons at 0.034 opt containing 6.0 million ounces • NRM: 142 million tons at 0.024 opt • Copper Reserves • 461 million pounds • Production • 13 years at average of 390,000 ounces Au, 27.5 million pounds Cu • ~$150/ounce cash cost (after by-product credits) • Production begins 2008 • Feed for Lone Tree autoclave • Capital Cost • $200 million - $225 million • Including $35 million for SX-EW / upgrading Lone Tree
Eastern Nevada Cornerstone of our Nevada Foundation Carlin Roaster • % Total Nevada • Reserves 15.1 million ounces 48% • Mining 52 million tons/year 35% • 2002E mine production – ~ 1.2 million ounces 36% • 2002E process production – ~1 million ounces 36%
Carlin Highlights • Roaster • Lower temperatures result in higher recovery • Improved availability • Bio-Mill • Improved heap permeability • Improved CIL efficiency • Deep Post • Exploration upside • Stockpile Management • Drilling and kreiging stockpiles • Maximizing cash flow • Concurrent Reclamation
Improving Roaster Productivity Throughput (000 tons) Availability % Grade and Recovery Ounces Produced (000) 9899000102E Grade opt 0.23 0.25 0.30 0.24 0.24 Recovery 90% 90% 88% 90% 91%
Western Nevada Featuring Million-Ounce Producer Twin Creeks Twin Creeks • % Total NV Reserves 16.2 million ounces 52% • Mining 100 million tons/yr 65% • 2002E mine production - ~2.1 million ounces 64% • 2002E process production - ~1.7 million ounces 64%
Western Nevada Opportunities • Manpower flexibility • Equipment utilization • Toll milling • Oxide mine plan at Phoenix • Synergies • Carbon handling (Carlin, Mesquite) • Refining (Carlin, Mesquite, Midas)
Twin Creeks Profile • Newmont’s largest Nevada mine % Total NV • Reserves 6.0 million ounces 19% • Mining 50 million tons/yr 33% • 2002E mine production - 1.30 million ounces 39% • 2002E process production - 1.03 million ounces* 36% • Processing • 2 autoclaves • 2 oxide mills • 3 oxide leach pads • *Includes other ore sources
Twin Creeks Autoclaves Production Summary 2002 Autoclaves - 3,454 k tons @ 0.243 opt - 89% Recovery = ~ 747,000 ounces* *Excludes Getchell toll milling
Lone Tree Complex Profile • %Total NV • Reserves 2.1 million ounce 7% • Mining 50 million tons/year 32% • 2002E mine production - 582,000 ounces 18% • 2002E process production - 573,000 ounces 21%
Lone Tree Autoclave Production Summary 2002 875 k tons @ 0.566 opt - 94.6% recovery = ~ 469,000 ounces
Midas Profile • Au Reserves ($300/ounces) • 2.1 million ounces • Production (10.5 months of 2002) • ~ 200,000 ounces • ~ 970 tpd • ~ 1.7 million ounces Ag by-product • Cash Cost ~$100/ounce • Free Milling
Midas Mining • High grade (0.67oz/t) • Quartz vein • Low sulfides • Narrow, steep dipping • Selective mining • Decline access
Midas Milling • Specialty mill • High recoveries • Merrill Crowe • Environmentally sound • Optimization study initiated
Midas Opportunities • Midas Synergies • Production • Staff • Hourly • Procurement • Ore Haulage • Bussing • Assays • Other • Annual Savings ~$8 million
Midas Highlights Additional Opportunities • Utilizing spare capacity at Twin Creeks for treating low grade ore • Increased production and efficiency • Exploration upside potential
Western Nevada Opportunities Truck Transfer • Equipment utilization • Lone Tree pit backfill • Reduced LOM mining cost 20% • Twin Creeks pit backfill • Reduced LOM mining cost 15%
Twin Creeks North Leach Pad Sloping Western Nevada Opportunities • Sloping of leach pads • Phoenix Project • Focus on capital reduction • Utilize idle Newmont milling assets • Review cost of crushing vs SAG milling • Use of Echo Bay-McCoy Cove assets • High pressure grinding rolls
Headframe at Getchell Property Western Nevada Opportunities • Getchell Ores • Tolling agreement • 125,850 tons • 0.417 opt • 49,234 recovered ounces to Placer Dome
Nevada Operations On-going Optimization • Optimize people: retention and development • Optimize equipment • Ore transport/processing synergies • Optimize procurement practices • Focus on technical staff and technology
Cautionary Statement PRIVATE SECURITIES LITIGATION REFORM ACT SAFE HARBOR STATEMENT This presentation contains “forward-looking statements” within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended, that are intended to be covered by the safe harbor created by such section. Such forward-looking statements include, without limitation, (i) estimates of future earnings, and the sensitivity of earnings to the gold and other metals prices; (ii) estimates of future gold and other metals production and sales, (iii) estimates of future cash costs and total production costs; (iv) estimates regarding future synergy savings from acquisitions; (v) estimates of future cash flows, and the sensitivity of cash flows to the gold and other metals prices; (vi) statements regarding future debt repayments and the restructuring or refinancing of credit facilities and other indebtedness; (vii) estimates of future capital expenditures; (viii) statements regarding future exploration results and the replacement of reserves; (ix) statements regarding future asset sales or rationalization efforts; and (x) statements regarding modifications to the company's hedge position. Where the company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, such forward-looking statements are subject to risks, uncertainties and other factors which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, gold and other metals price volatility, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as political and operational risks and governmental regulation and judicial outcomes. For a more detailed discussion of such risks and other factors, see Page 8 of the company's 2001 Annual Report on Form 10-K, which is on file with the Securities and Exchange Commission, as well as the company's other SEC filings. The company disclaims any intention to update any forward looking statement.