1 / 6

Agenda

Agenda. Safety Schedule Machine and system reports. Safety and training. Safety: Ed Lessard . Schedule. This and next week: - Physics stores Wednesday, March 30 – short Maintenance day (6-7 hours) Physics stores for the rest of the week

kioshi
Download Presentation

Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda • Safety • Schedule • Machine and system reports A. Fedotov, Time Meeting

  2. Safety and training • Safety: Ed Lessard A. Fedotov, Time Meeting

  3. Schedule This and next week: - Physics stores • Wednesday, March 30 – short Maintenance day (6-7 hours) • Physics stores for the rest of the week • Next week APEX and MD – to be discussed on Monday, April 4 Set-up for Au-Au 18GeV (1+1 week) run: • April 1 – start set-up in Tandem • April 4-8 – set-up in Booster/AGS (behind protons store in RHIC) • April 8-9 – should be ready to switch to Au-Au RHIC run, if such decision is made next week. A. Fedotov, Time Meeting

  4. Machine and system reports • RHIC Run-11 pp 500GeV Wolfram Fischer • STAR Xin Dong • PHENIX Takao Sakaguchi • AnDY Les Bland A. Fedotov, Time Meeting

  5. Machine and system reports • BLIP Leonard Mausner • Operations Peter Ingrassia • Maintenance Paul Sampson • RCF Mike Ernst • Jet • Polarimeter • RF/9MHz • Linac/EBIS A. Fedotov, Time Meeting

  6. Next Time meeting • Next Time meeting: April 5 A. Fedotov, Time Meeting

More Related