An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Communication Plan-Nigerian ExampleNational Malaria Control Programme Abuja, NigeriaBy Itohowo Uko (Ity) AMP BCC WORKSHOP. Sept, 21-24, 2010. BAMAKO, MALI-

  2. Presentation Outline • Overview of processes for development of the Generic Plan. • Summary of how the plan is used. • Overview of successes as well as lessons learned in developing the plan. AMP BCC WORKSHOP. SEPT,21-24, 2010. BAMAKO, MALI-

  3. Overview of processes for development of the plan. • RBM Partners met and developed BCC Strategic Framework for LLIN distribution using the Universal Coverage Model. • Process was inclusive and participatory with in-puts from relevant stakeholders. • Built on existing materials and successful approaches. • Follow-up meeting to develop LLIN Campaign Messages and Materials Matrix ((1st & 2nd drafts. Finalized and adopted) -Combined State Strategic Approaches, Channels /Tools and Key Message Concepts. • The adopted strategy further evolved into development of prototype materials and approaches which were pretested and shared for approval before production AMP BCC WORKSHOP. SEPT 21-24, 2010. BAMAKO, MALI-

  4. How The Plan Was/Is Being Used • The generic template and materials were developed at the National level. Kano was used as pilot • Each state is presented with the template and BCC materials for adaptation • Each state prioritizes, adapts, develops BCC interventions and materials • BCC materials are pre-tested, finalized and produced • Process is to encourage ownership at state/LGA levels as well as build capacity of state and LGA personnel • Lessons learned are fed back to the National and are being used to improve the process in subsequent campaigns AMP BCC WORKSHOP. SEPT 21-24, 2010. BAMAKO, MALI-

  5. Challenges and Lessons Learnt • Inadequate time to get the materials ready for campaign • Usual challenges of building consensus among stakeholders • Getting response from partners in a timely fashion • Available capacity in the states • Resource mobilization issues AMP BCC WORKSHOP. SEPT21-24, 2010. BAMAKO, MALI-

  6. THANK YOU & GOD BLESS. AMP BCC WORKSHOP. SEPT,21-24, 2010. BAMAKO, MALI-