1 / 8

Si/W ECal Update

Si/W ECal Update. Ray Frey. M. Breidenbach, D. Freytag, G. Haller, O. Milgrome, N. Graf Stanford Linear Accelerator Center RF, D. Strom U. Oregon. Outline Progress on silicon and tungsten Progress on readout electronics EGS4 v Geant4. Component Status: W, Si, readout.

kirra
Download Presentation

Si/W ECal Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Si/W ECal Update Ray Frey M. Breidenbach, D. Freytag, G. Haller, O. Milgrome, N. Graf Stanford Linear Accelerator Center RF, D. Strom U. Oregon Outline • Progress on silicon and tungsten • Progress on readout electronics • EGS4 v Geant4 R Frey 9/15/2003

  2. Component Status: W, Si, readout • W plates to make first full prototype arrive UO this week • 24 (20) plates, 25 mm x 6”x6”, 92.5% W, non-mag. • 12 (10) plates, 50 mm x 6”x6”, same alloy • Cu heat layer likely not needed – use the W to conduct • More study in progress • Silicon • Order for 10 prototype detectors sent to vendor today ! • Have readied test bench(es) to receive them (3 months) • Prep-ing with old (SSC vintage) detectors • Readout electronics • Each chip: 1000 x (analog, charge & time digit, calib., serial out) • Preliminary designs complete; need to fill in details; simulate • Conservative: increase channel footprint to 200m x 500m R Frey 9/15/2003

  3. Ref Range Bit Cf High Gain Buffered High Range Output Shaper Ccal Buffered Low Range Output Low Gain VCal Logic Threshold Buffered Timing Signal Ramp Common Timing Ramp 200 ns 8.3 ms

  4. Common Wilkinson Ramp Generator Wilkinson Scaler Scaler Bus 12 bits Threshold Timing Signal ADC Latch Threshold Latch (For Future zero suppression) Inputs from previous Page ADC Latch ADC Latch Output Buffer

  5. Si detectors: revised metallization R Frey 9/15/2003

  6. EGS Studies First: An old result 500 GeV electrons SD: 30 x 5/7 X0 SD vB: 20 x 5/7 X0 + 10 x 10/7 X0 R Frey 9/15/2003

  7. Geant4 v EGS4 – First Look G4: test beam setup, N. Graf: 30x(W+G10+Si+G10+Cu+air), 5 GeV e- EGS4: same config. Total Energy deposited: ← EGS4 (MeV) G4: 4960 ± 40 MeV Energy dep. in silicon: ← EGS4 (MeV) G4: 66 ± 5 MeV R Frey 9/15/2003

  8. Timeline (highly speculative) • 12/03: W and proto-Si in hand & undergoing tests • 12/03: readout chip design – complete 1st iteration • Winter 04: characterize detectors; prepare for B-field test • Readout few channels using external electronics • Spring 04: have first readout chips in hand • Summer 04: contemplate specialized tests in e- test beam • Electronics: heat, power pulsing, showers in chips • Detectors: resolution, noise, calibration • Summer 04: Next round of detectors and readout chips • Prepare for full-depth prototype • Fall 04: 1st bump-bonding trials • Winter 05: construct full-depth prototype for beam test(s) • In parallel, continue with simulations: • Technical: EGS4, G4 • Parameter optimizations based on PFlow R Frey 9/15/2003

More Related