1 / 4

WG4: Facilities, Testing and Technical Systems

WG4: Facilities, Testing and Technical Systems. Dave Dowell – leader John Power – co-leader. - WG4 Mission - Facilities, Testing and Technical Systems. Determine critical tests Identify existing/planned facilities. spy mission completed.

kirsi
Download Presentation

WG4: Facilities, Testing and Technical Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WG4: Facilities, Testing and Technical Systems Dave Dowell – leader John Power – co-leader

  2. - WG4 Mission - Facilities, Testing and Technical Systems • Determine critical tests • Identify existing/planned facilities spy mission completed

  3. Determine the critical experimental tests needed by the 3 WG’s -CSR modeling: Single pulse machines, JLab, etc. -Cathode studies: Maryland, LANL for high power operation, etc. -Non-intercepting diagnostics at high beam power: BNL ERL, etc. -Pulse-stealing needs analysis by SRF expert: JLab, etc. -HOM heating: BNL ERL, -Halo Studies: BNL ERL, JLab -BBU: Jlab etc. …spreadsheet

  4. Thanks to everyone for sharing your machine parameters!!

More Related