310 likes | 578 Views
Bongao DPP Bongao, Tawi-tawi. Installed capacity – 2 x 544 perkins genset Back-up for pb108, (7.2MW) Peak demand - 2.6 MW (grid total). Manuk Mangkaw DPP Tawi-tawi. Installed capacity – 1 x 163 kw perkins Peak demand – 80 kw 6 hours operation.
E N D
Bongao DPPBongao, Tawi-tawi Installed capacity – 2 x 544 perkins genset Back-up for pb108, (7.2MW) Peak demand - 2.6 MW (grid total)
Manuk Mangkaw DPPTawi-tawi Installed capacity – 1 x 163 kw perkins Peak demand – 80 kw 6 hours operation
Sacol DPPSacol Island, Zamboanga City Installed capacity – 1 x 163 kw perkins Peak demand – 155kw 6 hours operation Plant turn over to NPC SPUG from city government of Zamboanga City
Sibutu DppTawi-tawi Province Installed capacity – 2 x 163 kw perkins Peak demand – 240 kw 6 hours operation
West Simunul DPPTawi-tawi Province Installed capacity – 2 x 54 kw visa, 1 x 260 kw perkins Peak demand – 220 kw 6 hours operation
TANDUBANAK DPPTaunguh, Sibutu Island Unit no. 1, 1 x 280 kw Cummins Gensets Unit no. 2, 1 x 160 kw Cummins Gensets 6 hours operation, peak load 80 kw
Sitangkay DPPTawi-tawi Province Installed capacity – 2 x 280 kw cummins Started commercial operation – August 22, 2009
Basilan DPPIsabela City, Basilan Province Installed capacity – 1 x 1224 kw CKD, 1 x 448 kw CKD Back up units for PB 119, 7.2 MW Rented units 2 x 1000kw, 1 x 600 kw caterpillar units are stationed here. Peak system demand – 6.200 MW
Siasi DppSiasi, Sulu Installed capacity – 2 x 500 kw MAN, 2 x 560kw perkins, 2 x 260 kw perkins Peak demand – 680 kw 20 hours operation
Luuk DPPCamp Andres, Luuk, Sulu Installed capacity – 1 x 175 kw cat, 1 x 54 kw visa Peak demand – 225 kw 6 hours operation
Manuk Mangkaw DPPEast Simunul, Tawi-tawi Installed capacity – 1 x 163 kw perkins Peak demand – 80 kw 6 hours operation
Jolo DPPJolo, Sulu Installed capacity – 3 x 1.8 MW daihatsu Peak demand – 4.622 MW 24 hours operation Rented back up 1 x 1000kw, 1 x 1,500kw caterpillar
Mapun DPPCagayan de Tawi-tawi Installed capacity – 2 x 260 kw perkins, 1 x 500 kw MAN Peak demand – 350 kw 10 hours operation
Sibutu DPPSibutu island, Tawi-tawi Installed capacity – 2 x 163 kw perkins Peak demand – 240 kw 6 hours operation
Balimbing DPPPanglima Sugala, Bato-bato, Tawi-tawi Installed capacity : 2 x 163 kw Perkins, 2 x 150 kw Cummins 8 hours operation, 5:00pm to 1:00am
Power Barge 108Bongao, Tawi-tawi Installed capacity – 4 x 1.8 MW daihatsu (7.2MW) Peak demand – 2.600 kw 24 hours operation Backed up by land based plant
Power Barge 119Isabela City, Basilan Installed capacity – 4 x 1.8 MW daihatsu (7.2MW) Peak demand – 6.200 MW 24 hours operation Backed up by land based plant and rented units
SPUG MINDANAO • Eastern Mindanao Area Total system capacity – 9. 690 KW
Palimbang DPPsultan kudarat Installed capacity – 1 x 54 kw visa Peak demand – 48 kw 6 hours operation
Dinagat DPP (new PH)San Jose, Dinagat Island Installed capacity – 5 x 275kw cumper, 2 x 260kw perkins, 1 x 364kw 1 x 163kw perkins Peak demand – 1.220kw 18 hours operation
Loreto DPPDinagat Island Installed capacity – 2 x 220 kw ckd, 1 x 500 kw MAN Peak demand – 290 kw 8 hours operation
Talicud DppDavao del Norte Installed capacity – 2 x 163 kw perkins Peak demand – 160 kw 10 hours operation
Kalamansig DPPSultan Kudarat Installed capacity – 5 x 260 kw perkins, 1 x 220 kw ckd, Peak demand – 1.800 kw 24 hours operation, backed up by PB 111
Abad Santos DPPCaburan, Davao del Sur Installed capacity – 1 x 163kw perkins, 1 x 260 kw perkins Peak demand – 210 kw 10 hours operation
Balut DPPSarangani, Davao del Sur Installed capacity – 2 x 163 kw perkins Peak demand – 120 kw 8 hours operation
Hikdop DPPHikdop, Surigao del Norte Installed capacity – 2 x 163 kw perkins Peak demand -95 kw 7 hours operation
Power Barge 111Lebak, Sultan Kudarat Installed capacity – 4 x 560 kw perkins Peak demand – grid total 1.800 kw 24 hours operation Back up power of land based plant.
Ninoy Aquino DPPSultan Kudarat Installed capacity – 2 x 163 kw perkins Peak demand – 230 kw 12 hours operation
Thank you courtesy of: PERFORMANCE GROUP OMAR C. ANTOCAN MARVIN L. MADJAD RALPH P. ANTONIO