PROJECT: RELOCATON AND CONSTRUCTION OF NEW ILOILO – BACOLOD FASTCRAFT TERMINAL. Iloilo River Wharf, Iloilo City, Philippines. PHASE 2. PHASE 1. PROPOSED PORT DEVELOPMENT PROJECTS AT BRGY. PROGRESO, ILOILO CITY. PROPOSED DEVELOPMENT AT BRGY. PROGRESO, ILOILO CITY. PHASE 1
E N D
PROJECT: RELOCATON AND CONSTRUCTION OF NEW ILOILO – BACOLOD FASTCRAFT TERMINAL Iloilo River Wharf, Iloilo City, Philippines
PHASE 2 PHASE 1 PROPOSED PORT DEVELOPMENT PROJECTS AT BRGY. PROGRESO, ILOILO CITY
PHASE 1 • Clearing & Grubbing (5,375.00 sq.m.) • Containment (150.00 meters) • Reclamation of Slipways (499.00 sq.m.) • Passenger Terminal Building (2,200sq.m) • Site Development (5,375.00 sq.m.) • Mooring & Fendering System • Estimated Cost : Php. 175.00 Million • Duration : 360 c.d.
PHASE 2 • Reinf. Conc. Wharf (12,000.00 sq.m.) • Mooring & Fendering • Reclamation (1,142.00 sq.m.) • Containment (193.00 meters) • Estimated Cost : Php. 842.27 Million • Duration : 540 c.d.
SITE OF FORESHORE AREA FOR RESERVATION FOR PORT DEVELOPMENT PROJECTS