[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008). The Large Hadron Collider Contents: 1. The machine II. The beam III. The interaction regions IV. First LHC beam. III. First LHC beam. Contents: Injection test 1 Injection test II Injection test III

kordell
Download Presentation

[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Lectures at NIKHEF (12.12.2008) The Large Hadron ColliderContents:1. The machineII. The beamIII. The interaction regionsIV. First LHC beam

  2. III. First LHC beam Contents: • Injection test 1 • Injection test II • Injection test III • 10th September

  3. IV.1. Injection Test 1 8 to 10.08.2008

  4. IV.I. Injection Test 1 • Achieved • Synchronization SPS – LHC • Beam 1injected IP2 • Through to collimators in IP3 first shot • Trajectory correction • Kick-response measurements • Off-energy measurements (dispersion) • Explored the aperture • First beam induced quench • Discovered • Aperture restriction in the injection line • Traced to misaligned vacuum pump • Optics problem IP3 • Polarity convention QTL

  5. IV.II. Injection Test 2 22-24.08.2008

  6. IV.II. Injection Test 2 • Achieved • Beam 2 injected IP8 • Through to collimators in IP7 first shot • Trajectory correction • Kick-response measurements • Off-energy measurements (dispersion) • Explored the aperture • Beam 1 injected IP2 • Through to collimators in IP3 • Aperture in injection region OK • Polarity correction confirmed • Interleaved injection • Discovered • Optics problem at the end of the TI8 line

  7. I.I. Basic layout of the machine: quadrupole corrector magnets o o F D MSCB Orbit Explore a range of particle angles (=kick strength) with one corrector dipole, then go to the next one LHC TDR Chromaticity MSM (sextupole): Nominal main field strength = 4430 T/m2 Inominal = 550 A, 1.9 K, L=45.5 cm, ~83 kg MCBM (dipole): Nominal main field strength = 2.93 T Inominal = 55 A, 1.9 K, L=78.5 cm, ~143 kg

  8. IV.II. Injection Test 2 • Beam 1 injected IP2 • Through to collimators in IP3 • Aperture in injection region OK • Polarity correction confirmed • Interleaved injection • Discovered • Optics problem at the end of the TI8 line

  9. IV.III. Injection Test 3 5 – 7.09.2008

  10. IV.III. Injection Test 3 • Achieved • Beam 2 injected IP8 • Threaded to dump in IP6 • Steered then inject and dump • Beam 1 injected IP2 • Threaded through to coll in IP5 • Discovered • Optics problem in IP7 • Polarity convention on Q6 • Optics problem in IP4 • Polarity convention

  11. IV.IV. 10th of September 10.09.2008

  12. IV.IV. 10th of September • Achieved • Beam 1 injected IP2 • Threaded around the machine in 1h • Trajectory steering gave 2 or 3 turns • Beam 2 injected IP8 • Threaded around the machine in 1h30 • Trajectory steering gave 2 or 3 turns • Q and Q’ trims gave a few hundred turns

  13. ARC BPMs 49 mm aperture IV.IV. 10th of SeptemberBeam 1 – First turn trajectory Betatron oscillation Each point is a BPM (Beam Position Measurement)

  14. ALICE IV.IV. 10th of September Beam 1 on TDI screen – 1st and 2nd turns

  15. IV.IV. 10th of September Beam 2 – First turn trajectory Horizontal position (mm) Vertical position (mm)

  16. IV.IV. 10th of September Beam 2 – first turn dispersion measurement RF

  17. IV.IV. 10th of September Beam 2: Longitudinal Bunch Profile ~ 200 turns

  18. IV.IV. 10th of September Beam 2 closed orbit

  19. IV.IV. 10th of September Beam 2 beta measurement QF QD

  20. IV.IV. 10th of September Beam 2 beta measurement Reminder from BH lectures

  21. IV.IV. 10th of September Beam 2 integer tunes Qx = 64 Qy = 59

  22. IV.IV. 10th of September Beam 2 tunes Qx = .279 Qy = .310 BPM pos  FFT  tune

  23. FBCT IV.IV. 10th of September Beam 2 fast BCT (Beam Current Transformer) ~ 3 109 Intensity

  24. IV.IV. 10th of September Beam dilution on dump block Beam Dump Block (graphite) ~ 8 m concrete shielding

  25. IV.IV. 10th of September Beam 2 captured – mountain range display Turn number Now RF ON Bunch length

  26. IV.IV. 10th of September Fast start 10, 11 and 12 • All done in 3 days • Made possible by • Meticulous preparation • Magnetic model data • Sophisticated settings generation • Dry runs • Injection tests • Powerful control system (LSA) • Powerful instrumentation working very quickly • Logging a multitude of parameters • Allowed • early look at several machine parameters • systematic check of orbit system

  27. IV.IV. 10th of September