1 / 13

Conceptual Design TC comments ( II)

Conceptual Design TC comments ( II). Concept Stage. Development Stage. Production Stage. Retirement stage. Support Stage. Utilization stage. HL-LHC Life cycle. Dismantling. Requirements definition. Functional specification. Engineering specification.

koren
Download Presentation

Conceptual Design TC comments ( II)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conceptual Design TC comments (II)

  2. Concept Stage Development Stage Production Stage Retirement stage Support Stage Utilization stage HL-LHC Life cycle Dismantling Requirements definition Functional specification Engineering specification Fabrication, Assembly and Verification Installation - Comissioning Operation & Maintenance Organizational Project-Enabling Processes Project Processes: Planning, Measurements, Assessment, Control, Risk, Configurarion, Information, Decision Management Acquisition Process Moving from the concept to the development stage implies an assessment and a validation of the requirements.

  3. Moving from Concept to Development This validation shall at least include a common agreement on the following requirements: Performance parameters Technical parameters Configuration and installation constrains Interface parameters Cost and Schedule constrains

  4. WPs included

  5. Time line

  6. Work to be done after Implement comments received during this sessions (July – Sep 2014) Consolidate de conceptual specifications and find missing tasks and incompatibilities (July – Sep 2014) Prepare be first Schedule (July - Oct 2014) Prepare de bottom up budget (July - Dec 2014) Start the conceptual specifications for the “software wps” and for the technical infrastructures and services (Sept - Dec 2014)

  7. WP 3 Magnets for Insertion Regions

  8. WP4 Crab Cavities and RF systems

  9. WP 5 Collimation

  10. WP 6 Cold powering

  11. WP7 Machine protection

  12. WP9 Cryogenics

More Related