1 / 10

1SR Navigation Systems What’s New in 2010?

1SR Navigation Systems What’s New in 2010?. Navigation Systems – What’s New in 2010. New partnership with ANTs & Sectors PATON program partnership between 1SR & 1NR Joint 1SR & 1NR PATON Inspection & AV Qualification policy.

kory
Download Presentation

1SR Navigation Systems What’s New in 2010?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1SR Navigation SystemsWhat’s New in 2010?

  2. Navigation Systems – What’s New in 2010 • New partnership with ANTs & Sectors • PATON program partnership between 1SR & 1NR • Joint 1SR & 1NR PATON Inspection & AV Qualification policy. • D1 DCO RADM Nimmich wants all PATONS in District 1 verified this year – 100% coverage. 2

  3. Navigation Systems – What’s New in 2010 • On-line PATON Database System • New AV Qualification Program • AV Currency Maintenance • New 1SR Navigation Systems Web Site • www.USCGAux1SR-ATON.org

  4. AV Qualification Program • One day-long district led AV training course • Pre-course mandatory reading • Pre-course open-book test • Post course open book test • 3 Supervised PATON Verifications

  5. AV Qualification Program District AV training courses: 6 March Station Jones Beach 10 April Metuchen 17 April Poughkeepsie area 17 April North Jersey 24-25 Apr Station Burlington TBD Station New Haven

  6. AV Currency Maintenance • Two N.S. discrepancy/verification reports must be filed each year. Acceptable reports are: • ATON discrepancy report • PATON discrepancy or verification report • Bridge survey or discrepancy report

  7. AV Currency Maintenance • Failure to file 2 reports/year = REYR status • Five continuous years in REYR = loss of AV qualification

  8. PATON Database System • All PATON data in one on-line location • Owners file PATON applications on-line. • CGAux verification & discrepancy reports filed on-line. • Sector, ANT & DPW in Boston see the same current information. • CGAux gets PATON verification notice via system.

  9. PATON Database System • Only DSO approved & trained AVs get system logins • All other AVs send reports via their division’s database entry person • Non-AVs send reports via normal 1SR 7054 discrepancy form. • Add database ID requests to be sent via NS chain, not by clicking link on the database site.

  10. The End

More Related