1 / 5

PROJECT OVERVIEW

The City of Phoenix seeks a qualified Construction Manager at Risk (CMAR) to provide design assistance and construction services for water mains replacement. The project includes the replacement of approximately 980 linear feet of 4-in, 12,540 linear feet of 6-in, and 2,730 linear feet of 8-in water main, as well as fire hydrants and cut & plugs. The estimated construction cost is $4 million.

kost
Download Presentation

PROJECT OVERVIEW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRE-SUBMITTAL CONFERENCE for PROJECT No. WS85509010-1WATER MAIN REPLACEMENTABB: THOMAS RD TO OSBORN ROADAND 24TH STREET TO 28TH STREETJanuary 24, 2017

  2. PROJECT OVERVIEW • The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide abbreviated design phase assistance and complete construction services for the replacement of water mains in an area bounded by Thomas Road to Osborn Road and 24th Street to 28th Street. Work will include replacement of approximately 980 linear feet of 4-in, 12,540 linear feet of 6-in, 2,730 linear feet of 8-in water main, 3,350 linear feet of 12-in, 25 fire hydrants, and 38 cut & plugs. The total estimated construction cost is approximately $4 million. Work may also include construction administration and inspection services.

  3. EVALUATION CRITERIA FOR DESIGN SERVICES General Information 15 points Experience & Qualifications of Prime Firm 20 points Experience of Key Personnel/Subs 25 points Project Understanding & Approach 30 points Overall Evaluation of the firm 10 points TOTAL 100 POINTS

  4. SUBMITTAL REQUIREMENTS Closing date: February 3, 2017 12 noon • Six (6) copies and Maximum of 12 pages • Paper must be 8.5 x 11 and Font no smaller than 10 point • All pages containing information responding to evaluation criteria count towards the page count—front and back of pages, project photos, charts, graphs and resumes. • Drop off solicitations on or before closing date • Address SOQs to:City of Phoenix Kini L.E. Knudson, PE, City Engineer 200 W. Washington Street, 6th Floor Phoenix, AZ 85003-1611 c/o Donna Wiltshire, Contract Specialist • Deposit on the 6th Floor of City Hall. Place submittals in the depository located in the reception area on the 6th Floor , Phoenix City Hall.

  5. Questions? From this point forward, your ONLY point of contact is Donna Wiltshire Donna.Wiltshire@phoenix.gov 602-495-3654 Last day for written questions is January 31, 2017

More Related