An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Creation of RU Tier-1 resource center for ATLAS, ALICE & LHCb in NRC “KI” V. Velikhov, V. Ilyin, Е. Ryabinkin, Yu. Lazin

  2. RU Tier-1 overview • Tier-1 in NRC “KI” will: • support 3VOs: ALICE, ATLAS and LHCb; • run both WLCG general services and VO-specific services*. • We define 4 milestones*: • Dec 2012— prototype with 10% of resources, LHCOPN — 2 Gbit/sec; • Jul 2013 —test LHC OPN (2 Gbit/sec), WLCG and VO-specific services, resource upgrade, LHCOPN — 10 Gbit/sec; • Nov 2013 —test LHC OPN (2 Gbit/sec), resource upgrade to the 10% of the world summaryTier-1 capacity for 2012; • Dec 2014 — LHC OPN, WLCG and VO-specific services are test to comply with A&R requirements; resource upgrade. • * Details are outlined in the execution plan

  3. RU Tier-1 team Е.Ryabinkin Administrator, ALICE services Yu. Lazin Administrator, LHCb services V. Velikhov HeadofComputingComplex New staff is coming… F. Checherov Core software and WLCG middleware (TAPE library) I. Tkachenko Core software and WLCG middlware A. Shitov Network support R. Kolchin Core software and WLCG middlware I. Lyalin ATLAS services

  4. NRC KI Data Center & Computer rooms 4x400 m2 computer rooms

  5. Power & Cooling infrastructure Electrical and mechanical subsystems: 7.5 MVA

  6. Connectivity of RU Tier-1 to academic networks • MSK-IX/G-NAP: KI – 10 Gbit/sec, JINR – 20 Gbit/sec • GEANT: 10 Gbit/sec via e-Arena (Russian PoP) • Russian Tier-2: connectivity via G-NAP, RadioMSU, RUNnet

  7. Connectivity of RU Tier-1 to CERN • CERN/OPN connectivity in 2012:GEANT-IP, 2 Gbit/sec. • Channel goes through the secondary link via Danmark, no backup

  8. Connectivity for RU Tier-1 at milestone 2 • 10 Gbit ring: KI → AMS → BUD → JINR → KI • Goes to CERN via BUD → GVA DWDM line • Supplements existing GEANT link

  9. Growth of Tier-1 resources in NRC KI • Disk resources include tape buffer pools • Resources of 2014 are calculated as 30% increase fromfigures of 2013

  10. Tests to be done at milestone 2, NRC KI • OPN integration tests • OPN functional tests at 2 Gbit/sec • SAM/Nagios tests for supported VOs • ATLAS functional tests • ALICE functional tests • Raw data transfer with ATLAS and ALICE to the tape system (2 Gbit/sec OPN link) • Test of publishing accounting data toAPEL

  11. Tests to be done at milestone 3, NRC KI • OPN functional tests at10Gbit/sec • SAM/Nagios tests for supportedVOs* • ATLAS functional tests* • ALICE functional tests* • Raw data transfer with ATLAS andALICE to the tape system (10 Gbit/sec OPN link) • * Tests at the resource level of 2013

  12. NRC KI Tier-1 Staffing

  13. Thanks! Thanks for your attention! Questions?