An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Milagro Observatory Update Brenda Dingus 4/20/2007

  2. Power Outages • Need one computer (sparks) to come back to life after long (several hours) outage • sparks controls the switches which allow us to reboot the other computers • sparks was a Dell laptop, but wouldn’t restart when power came back • sparks is now a Mac laptop, but the Mac can’t communicate with the switches • Bought a new switch that’s supposed to be Mac OS compliant, but maybe the Mac is too old • Does anyone have a newer Mac that we could use?

  3. CAEN High Voltage • Communication with mems died twice such that the voltages and currents are not read out for the EMS page and are not controllable via gohv. • Both times gohv was running when this happened. • DON’T RUN gohv ANY MORE. • Replacing a chip fixed the problem the first time (Sep. ‘06), but not the second time (yesterday). • This HV chassis is no longer made by CAEN. • Replacing the chassis means replacing the pods as well. Total cost $30-40k.

  4. Disk Archiving • RAID Kings have been dying. • Being replaced with higher density disks. • How much space do we need? • Store data (gamma, crab, rec, grb) for transport on portable to LANSCE • Store RAW data for TBD weeks • TBD was ~6 weeks • HOW MUCH RAW DATA SHOULD WE STORE?

  5. Trigger Rates • New shorter time window trigger was implemented ~January 10. • Crab should be ~ 4 sigma since then. • CAN SOMEONE VOLUNTEER TO CHECK. • Gives more stable rate and higher % fit • However, no ice last winter. Due to early, large snow fall, the ice layer formed above the cover. • Rate did decrease in winter due to ~15cm water equivalent on top of cover. Multiplicity rate was lowered to give ~ same total rate. • Pumped water off cover. Only lost ~2 cm of water out the drain. • SHOULD WE REFILL AND ADD MORE WATER?

  6. Outrigger Trigger • Purpose is to improve effective area for high energy gammas off the pond. • Should be small increase in total trigger rate. • I’ll measure rates next week on Wed. • Need more MC simulation to identify best trigger for high energy gammas • 185 ns gate is not long enough to get all OR for larger zenith angles • Could combine lower multiplicity from individual patches

  7. To Repair or Not to Repair • Currently ~20 dead MU pmts & ~20 dead AS pmts • Need to remove curtains that are around 2 pmts, but this could be done independently • Maybe we could repair in June??? • Water is cold, but air is warm and usually no thunderstorms • September may interfere with HAWC proposal

  8. Misc. • SIGN UP FOR SHIFT • 2 Person Rule being revised • WACT pads, buildings, mounts and mirrors scheduled to be demolished • Does anybody care? • Next collaboration meeting date • ICRC preliminary papers due May 31 (final Aug 15) • ICRC July 3-11 • Need HAWC meeting soon • Resubmit proposal in Sept. • Panel review in Oct? • LANL wants to do review prior to panel review