An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beam Current Limits at the end of Run 6 M. Sullivan and F-J Decker for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007

  2. HER Beam current • In the middle of August we developed a vacuum leak in the upstream HER beam line from the detector. The leak closed when the beam was lost. • Limited the HER beam to 1775 mA • Then to 1800 mA • Gradually pumped out (virtual?) and was not a limit near the end of the run

  3. HER beam current limit • About the same time we lost the power supply for LER RF station 4-3 and had to take the power supply of HER RF station 4-6. • Lowered the maximum possible HER beam current to 2 A. • At the end of August we were now running into record breaking territory and decided to not push too hard. • At the very end of the run HER RF station 12-1 had to be turned off due to vacuum problems and arcing • This limited the HER beam current to 1.8 A

  4. LER beam current • Throughout August the LER beam current stayed at about 2.6 A • We tried to push up the LER current in the latter part of August • Luminosity kept going down as the LER current went up (Decker’s talk) • We got up to about 2.75 A • Only briefly though and when we pushed the HER beam current up to 1.9 A • Tried an RF MD to try for 3 A • A fairly big jump in total beam current • RF system needed more tuning and processing