sPHENIX Infrastructure, Integration and Installation Conceptual Design Review: Integration

Detailed review of integration and installation plans for sPHENIX project, including subsystem interface, design drivers, and envelope control drawings.

kristinl
Download Presentation

sPHENIX Infrastructure, Integration and Installation Conceptual Design Review: Integration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. sPHENIX Infrastructure, Integration and Installation Conceptual Design Review: Integration January 10, 2018 Don Lynch and Rich Ruggiero

  2. WBS Structure & Control Accounts • 1.10: sPHENIX Installation and Integration • (Don Lynch) 1.10.1: Infrastructure Project Management and Oversight 1.10.2: Integration Documentation, Technical Coordination, Installation, Tooling, Fixtures and Subsystem Installation Key Personnel: D. Lynch L2 Manager, sPHENIX Chief Engineer R. Ruggiero, Lead Design Engineer, sPHENIX Documentation Control Manager M. Chiu, Chair, sPHENIXOffice of System Integration 1.10.2.1: Subsystem Interface & Integration Plan 1.10.2.2: Infrastructure Integration/Installation 1.10.2.3: Cradle Carriage Integration/Installation 1.10.2.4: sPHENIX SC Magnet Installation 1.10.2.5 : Outer HCal Integration/Installation 1.10.2.6: Inner HCal Integration/Installation 1.10.2.7 : EMCal Integration/Installation 1.10.2.8: TPC Integration/Installation 1.10.2.9: INTT Integration/Installation 1.10.2.10: MVTX Integration/Installation 1.10.2.11: Min Bias Integration/Installation 1.10.2.12: sPHENIX Full Detector Integration/Installation sPHENIX Infrastructure, Integration & Installation CDR

  3. INTEGRATION DESIGN DRIVERS • Subsystem Design - Staying in envelope. • Safety – Installing and accessing detectors safely. • Access for repair, maintenance & upgrades. • Existing Infrastructure (shield wall opening, Crane coverage and limits, rail layout) • Minimum material in active areas. • Other (Future upgrade capability) sPHENIX Infrastructure, Integration & Installation CDR

  4. SPHENIX EXPLODED VIEW SOUTH ENDCAP (FLUX RETURN) COIL CHIMNEY CRYOSTAT/SC COIL OUTER HCAL INNER HCAL NORTH ENDCAP TPC (FLUX RETURN) SOUTH EMCAL SOUTH DETECTOR SUPPORT MVTX INTT MINBIAS NOT SHOWN NORTH EMCAL NORTH DETECTOR SUPPORT sPHENIX Infrastructure, Integration & Installation CDR

  5. SPHENIX ENVELOPE CONTROL DRAWINGS NOTES: 1. NOTED DIMENSIONS ARE MAXIMUM SIZE. ALL SERVICES, NUTS, BOLTS & OTHER DETECTOR COMPONENTS SHALL NOT EXCEED THESE DIMENSIONS. 2. ALL DIMENSIONS ARE IN mm[inch]. • - AUTOCAD DRAWING • SHOWS RELEVANT EXISTING INFRASTRUCTURE • ONGOING EFFORT FOR SPHENIX sPHENIX Infrastructure, Integration & Installation CDR

  6. sPHENIX Outline/Interface Drawings Outer HCal SCMagnet Inner HCal EMCal TPC INTT, MAPS & Min Bias Envelopes in progress sPHENIX Infrastructure, Integration & Installation CDR

  7. INTEGRATION DRAWING LIST SP00-000-000 – Overall Envelope SP00-000-001 – MINBIAS ENVELOPE SP00-000-002 – MAPS ENVELOPE SP00-000-003 – INTT ENVELOPE SP00-000-004 – EMCAL ENVELOPE SP00-000-005 – OUTER HCAL ENVELOPE SP00-000-006 – MAGNET ENVELOPE SP00-000-007 – INNER HCAL ENVELOPE SP00-000-008 – TPC ENVELOPE SP00-000-009 – RESERVED SP00-000-010 – EMCAL OUTLINE/INTERFACE SP00-000-011 – MINBIAS OUTLINE/INTERFACE SP00-000-012 – MAPS OUTLINE/INTERFACE SP00-000-013 – INTT OUTLINE/INTERFACE SP00-000-014 – EMCAL OUTLINE/INTERFACE SP00-000-015 – OUTER HCAL OUTLINE/INTERFACE SP00-000-016 – MAGNET OUTLINE/INTERFACE SP00-000-017 – INNER HCAL OUTLINE/INTERFACE SP00-000-018 – TPC OUTLINE/INTERFACE SP00-000-019 – RESERVED SP00-000-020 – RESERVED sPHENIX Infrastructure, Integration & Installation CDR

  8. 41 ICD’s needed, 28 issued so far (1st drafts) sPHENIX Infrastructure, Integration & Installation CDR

  9. sPHENIX Configuration ManagementGuidelines and Procedures • Configuration Management Doc. # sP-SE.QAM.003 (Rev A (final draft)) • Derives from SBMS • Uses C-A OPM 13.6.2 “Configuration Management” (flow down from SBMS) (facilities, line electric, A-1 systems and safety systems) • sPHENIX (experimental equipment not covered above) • Changes to C-A managed facilities and equipment processed through C-A: “ECN’s” • Changes to sPHENIX experimental equipment processed through sPHENIX and reviewed by C-A Experimental Safety Review Committee (ESRC) (Note: ESRC review of new experimental equipment prior to installation and prior to operation also required): “ECR’s” • Prior to Baseline, changes to subsystems are evaluated by L2 subsystem, L2 manager. Any changes affecting performance, envelope/outline/interface must be reviewed and approved by sPHENIX management. Minor changes may be approved by the L2 or his designee. • After Baseline all changes to subsystems must be submitted for review and approval in accordance with sP-SE.QAM.003 requirements. • Documentation Control, Doc. # sP-SE.QAM.002 (Rev A (final draft)) • Originals controlled by originating group (C-A and SMD use “WINDCHILL”, sPHENIX uses “VAULT”) • Provisions for non BNL created drawings (copy of latest version stored in WINDCHILL/VAULT • Drawing numbers, formats, QA, release process, specifications also covered • Also have created rev controlled documents for: Design Review, Procurement, Procedure Format, Safety and Work Planning Guidelines sPHENIX Infrastructure, Integration & Installation CDR

  10. Approval Process • Initial Specifications • sPHENIX Parameters worksheet – derived from Conceptual Design Report • Mechanical Drawings, Infrastructure (detector support services) Documentation • Experimental cooling services support • Detector gas systems (low pressure experiment side) • Mechanical detector structural suppport Requestordesigner checker engineer chief engineerQA [VAULT] / ESRC • Facility Support • Facility mechanical support • Electrical (line) • Gas System (high pressure, supply side) • Facility Safety systems],  (CAD CM) [WINDCHILL] • Changes • Minor (do not affect performance, envelope, cost, safety, operations) subsystem engineer approval • Major (all others)sPHENIX management and as specified in governing CM (sPHENIX or CAD) sPHENIX Infrastructure, Integration & Installation CDR

  11. Integration Technical Status • Infrastructure/Central Pedestal – Pre-Conceptual • Solenoid Magnet – Conceptual • HCal Inner – Advanced Conceptual • HCal Outer – Advanced Conceptual • EMCal – Advanced Conceptual • TPC – Advanced Conceptual • INTT – Pre-Conceptual • MAPPS – Pre-Conceptual • MINBIAS – Pre-Conceptual Prec-conceptual • Pre-Conceptual – Know we can meet requirements but do not have an accurate model. • Conceptual – Have a model but no detail drawings. • Advanced Conceptual – Have a model nearly ready for detailing. • Detail Design – Detail drawings in progress. • Advanced Detail Design – Detail drawings nearly complete. • Final Design – Completed detail drawings awaiting final design review. • As Built sPHENIX Infrastructure, Integration & Installation CDR

  12. SUMMARY • Services routing and cable management preliminary concept in place. • Subsystem cad program integration (solidworks, inventor, creo etc.) Will be integrated into autodesk vault using pdf and step files. • Incorporating alignment capabilities into support design is in progress. • Inner detector integration task force was formed to help identify any integration challenges. • sPHENIX Project personnel supplemented by CAD professionals and techs sPHENIX Infrastructure, Integration & Installation CDR