.hmc. Starting of work with Puja on 01-09-2008. . hmc.Dust System . .hmc. DS System Civil work in progress. .hmc. DS System erection of pipeline etc. .hmc. . hmc . WT-(CI) DS System-BSP- Bhilai Spray activated during unloading. .hmc. Pre-Wetting . .hmc.
E N D
.hmc. Starting of work with Puja on 01-09-2008 .hmc.Dust System
.hmc. DS System Civil work in progress
.hmc. DS System erection of pipeline etc
.hmc. .hmc. WT-(CI) DS System-BSP-Bhilai Spray activated during unloading.
.hmc. Pre-Wetting
.hmc. Spray-Bar Mist SprayBottom Spray x 2 side
.hmc. DS System Spray ON/OFF
.hmc. Spray-Bar-High Pressure x 2 side
.hmc. Spray-Bar-High Pressure x 2 side
.hmc. DS System Pump House & Tank
.hmc. DS System Pumps -grundfos
.hmc. DS System Pums –HP
.hmc. DS System MCC room Panel
.hmc. DS System Duplex Filter (inlet)
.hmc. Spray-bar –with Anti drip